Laserfiche WebLink
LEGEND <br /> AWE = AQUEOUS WASH RETURN <br /> 9 1 2 3 GENERAL NOTES <br /> 1. FOR AIR SYSTEM SEE DRAWING <br /> TN M 1 11—AIR—COMPOSITE. <br /> 2. FOR POTABLE AND PROCESSED WATER SYSTEM SEE <br /> DRAWING TNM110 WTR COMPOSITE. <br /> MATCH LINE ALL PIPING AND EQUIPMENT WITHIN CLOUDS IS <br /> EXISTING UNLESS NOTED OTHERWISE. <br /> SEE DWG UGM115 <br /> REVISED AQUEOUS WAS RETURN ROUTING PER RFI <br /> 005 (PROLOG 11001, 07/24/17). <br /> C 1 <br /> I <br /> '1C2"AWIR- I REFERENCE DRAWINGS <br /> 6" A <br /> I I I I IN <br /> J ' C <br /> REMOVAL NOTES <br /> aw <br /> REMOVE AQUEOUS WASH RETURN (AWR) PIPING. <br /> 1 <br /> 2" PSAN UGM120 UGM504 UGM12 UG 0 M504 66 SUMP WI H MP <br /> 2'4 X 3' DEE P <br /> SEE DET A <br /> 40-026—N.9-01.3 40-026 N.9-02.0 UGM 20 GM506 <br /> 40 026—N.9-01 7 2" PSAN <br /> �aw SAN SAN SAN SAN SAN SAN SAN <br /> END AND C 4" A <br /> 65 Z MP WITH PUMP2" PSAN 4„ CW 1 1/2"AWR- <br /> SEE DETAIL <br /> I I UGM120 UGM506 I I <br /> 2" PSAN <br /> I I <br /> I MATCH LINE I 5 7 <br /> F �T SEE DWG UGM125 B DG T <br /> 40 25 <br /> T <br /> 0o no P <br /> GM11 UGM111UGM112JGM113 GM11 <br /> r� <br /> N.3 I <br /> GM11 UGM116UGM117UGM118 GM11 00 <br /> PARTIAL UNDERGROUND PLAN �I <br /> SCALE:1/8"=1'-0" FIN. FLR. ELEV. 92'-0" GM12 UGM121UGM122UGM123 GM12 P m <br /> GM12 UGM1261JGM127JGM128 GM12 <br /> R <br /> BLDG 40-27 <br /> KEY PLAN—0 <br /> fs� ISSUED FOR CONSTRUCTION SCALE: NONE <br /> REMOVAL:] PROFESSIONAL STAMP & SIGNATURE ENGINEERS 4' 2' 0 4' 8' 12' 16' 20' <br /> APPLIES TO WORK WITHIN THE CLOUDED Seattle//Spokane//Baltimore DESIGN BY FSi DATE 03.14.24 <br /> REVISION AREAS ONLY AS INDICATED <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN E^.r- -I­_LE CURRENT REVISION SYMBOL DATE <br /> M. cy AccESIGN AND/ PARTIAL PLUMBING PLAN-TUNNELS-REMOVAL <br /> A MOVED AIR&WATER COMPOSITES — JPO — 03.23.17 ��,a wns„q� THIS DESIGN AND/OR cNECKEc W8861360 03.14.24 <br /> 4p "�' SPECIFICATION IS APPROVED srleET <br /> B AQUEOUS WASH POS 3 wBs252 JEBBOE/A/G® W ENGINEER rlr�E 737 NORTH LINE — 40-26 WING TANK CLEANOUT UGM 120 R <br /> APPROVED BY DEPT. DATE <br /> C 737 NORTH LINE— 40-26 WING TANK CLEANOUT W8861360 `Si KMC 03.14.24 CHECKED <br /> FSO5i0.0.G��' APPROVED BUILDING 40-026 JOB NO, WBS252 COMP NO. <br /> NAL E <br /> APPROVED MECHANICAL MASTER COL N.7—P/0.9-3 EVERETT, WA DWG NO. 40-21—UGM12OR <br />