Laserfiche WebLink
LEGEND GENERAL NOTES <br /> X HYDRAULIC PIPE ANCHOR 1. SEE 40-026-MOI FOR PIPING SPECIFICATIONS <br /> HYDRAULIC PIPE GUIDE <br /> B HYDRAULIC LOW POINT DRAIN 2�1" REDUCED-PRESSURE BACKFLOW PREVENTER <br /> �a HYDRAULIC RETURN SINGLE BLOCK AND BLEED WATTS: 909 <br /> VALVE CONFIGURATION <br /> po--pd HYDRAULIC SUPPLY DOUBLE BLOCK AND BLEED Lj->4" BUTTERFLY VALVE: DEMCO 22122-5114351 <br /> T <br /> 3.5 4 45 VALVE CONFIGURATION ] <br /> PIPE SUPPORT 4. IN ALL TUNNELS, UTILIDORS, AND TRENCHES WITH <br /> HYDRAULIC PIPING (EXCEPT PEDESTRIAN TUNNELS), <br /> PROVIDE THE FOLLOWING FLOOR COATING: <br /> NEOGARD 70714/70715 CHEMICAL RESISTANT <br /> PRIMER: 2 COMPONENT 100% SOLIDS EPDXY RESIN <br /> CYCOALIPHATIC <br /> 1"PPCW UP <br /> N OGARD707 A HARDENER,14/ 0715100% SOLIDSEPDXY (LP) <br /> COATING FINISH. <br /> MATCH LINE 2" HYDRAULIC SUPPLY 5�SEE STRUCTURAL DRAWING S665, DETAIL 10 FOR <br /> UGM121 M466 3 5 4" HYDRAULIC RETURN GUIDES. <br /> -- -- -- -- -- -- -- -- -- <br /> SEE DWG UGM116 PIPE RUNNING 18" <br /> 3 3" SAN � ©SEE STRUCTURAL DRAWING 5665, DETAIL 1 FOR <br /> UGM121 M584I AFF, 6" OFF WALL ANCHORS. <br /> VALVE NUMBER: <br /> 5 a 40-26-S-X 11 FOR HYDRAULIC SUPPLY DOUBLE BLOCK AND BLEED <br /> D UGM121 M547 35 3 2 1 1/2" SAN UP I C VALVE ASSEMBLY, SEE DETAIL 3/M5XX. FOR <br /> 2" PSAN HYDRAULIC SUPPLY AN UGM121 UGM501 HYDRAULIC RETURN SINGLE BLOCK AND BLEED VALVE <br /> 89B 5 RETURN UP TO FD #8 ASSEMBLY, SEE DETAIL 4/M5XX. <br /> VERTICAL EXPANSION <br /> SP LOOP 8'x4'x8' ®FOR HYDRAULIC BERM CONTAINMENT DETAIL, SEE <br /> 89A 2" PSAN D STRUCTURAL DRAWING 5/S305. <br /> o <br /> w SEE STRUCTURAL DRAWING 5665, DETAIL 8 FOR <br /> ° vw HYDRAULIC PIPE SUPPORTS. <br /> - -----------5 <br /> 14 VALVE NUMBER: 40-26-R-X<a 10 SEE STRUCTURAL DRAWING S665, DETAIL 9 FOR <br /> VALVE NUMBER: 40-26-R-X <br /> 10 HEAVY DUTY HYDRAULIC PIPE SUPPORTS. <br /> I I 16 12 <br /> 5 ^ 11 BVHS20FH2242JA2UZZD, SAE C62 4-BOLT FLG, 316 <br /> - ---------------- - SPINDLE, PEEK SEALS STAINLESS BODY, 316 BALL <br /> VERTICAL EXPANSION LOOT 8'x4'x8' / <br /> 10 BUSHINGS AND WASHERS, EPR 0-RING, W/SR <br /> I ACTUATOR. BI-TORQ, PN-145-SR SPRING W/CAB <br /> a 15 VALVE NUMBER: 40-26-S-X <a LIMIT SWITCHES AND NAMUR SOLENOID. 1080 IN-LB. <br /> SP SUMP WITH PUMP - ---------------- - 14 VALVE NUMBER: 40-26-R-X 2 <br /> 74 30"4 X 4' DE ;,o 12 SEE DRAWING 40-26-MXXX, DETAIL X FOR SPRAY <br /> SEE DETAIL A 13 VALVE NUMBER: 40-26-S-X 2 SHIELD. <br /> UGM121UGM506 I <br /> 5 1 13 SEE 1/M605-11 FOR HYDRAULIC SUPPLY LOW POINT <br /> 1 DRAIN DETAIL. <br /> I� 14 SEE 2/M605-11 FOR HYDRAULIC RETURN LOW POINT <br /> B 7 VALVE ASSEMBLY: 40-26-S-X 0 DRAIN DETAIL. <br /> ROUTE ABOVE <br /> ZIP 4" SAN UP AND ELECTRIC TRAY UGM121UGM502 - --------------- 1 <br /> _ 1 15 SEE 2/M59X FOR HYDRAULIC SUPPLY HIGH POINT <br /> I� SYSTEM POC TO TRAILER 7 VALVE ASSEMBLY: 40-26-R-X (2' BELOW CEILING) VENT DETAIL. <br /> o BACKWATER VALVE - 5 <br /> w J.R. SMITH FIGURE 7012 M 2�GN7501 <br /> 1" CW UP OR OTHER APPROVED. 1 1/2" AIR LINE WITH BALL SUPPLY PIPE DN 4" UP 88" 15'-4 1/2" 6 SEE 3/M59X FOR HYDRAULIC RETURN HIGH POINT <br /> VALVE UP TO 1ST FLOOR. — 5 PIPE RUNNING 2' BELOW <br /> 2T OFF WALL DN 1' — ---_--- --- 8 6 VENT DETAIL. <br /> FII 2 HPIPFS 6" <br /> 40�-026�-�N�.9-0p L..0 40-026-N.9-0 .2 5 BELOW CEILING — CEILING, 6" OFF WALL <br /> CO SLOPE 1% g 6 4" HYDRAULIC RETURN <br /> — D <br /> 4" HYDRAULIC RETURN 4" A 4" SAN 6" DEEP 'RUNNING' TRAP 1" CW 6 4" SAN 5 7/8" 1 UGM121 UGM501 <br /> 1 IE 98'-0' 4"A 18'-0" 6'-0' IE 96'-10" 6" PSAN 2" HYDRAULIC SUPPLY CONSTRUCTION NOTES <br /> PIPE RUNNING 2'-8" BELOW PIPE RUNNING 2'-8" I I D <br /> CEILING, 6" OFF WALL BELOW CEILING, 6" RETURN PIPE - -------------- - � VALVE ASSEMBLY: 40-26-R-2`� � ROUTE PSAN TO LIFT STATION SE-6. <br /> OFF WALL 6" OFF WALL <br /> Iq <br /> VALVE ASSEMBLY: 40-26-S-2 a 2� PROVIDE 1 1/2" SAN UP THROUGH SLAB. <br /> 1 --------------- PROVIDE PPCW PIPE UP THROUGH SLAB. <br /> I � � 1 <br /> - ---------------- - 1' CW 1 <br /> 3/4" A <br /> 3 5 7 9 11 <br /> I 2" 4" 2" PSAN os Qn' <br /> ---------- ----- 6" PSAN 1 ----- ,----B - —i 25 J t <br /> IE 96'-5' 1 1 I�GM11OUGM1110GM1121UGM11-*GM114' <br /> MATCH LINE <br /> -- -- -- -- -- -- -- - -- -- -- -- - -- -- -- --- ---- - -I- - N.3 I <br /> SEE DWG UGM126 UGM1171UGM118UGM11d� o <br /> �JGM1 I�UGM <br /> I P I�1GM12aUMM21PGMI 221 GM I23PGMI24 N7 J----- <br /> IJGM125UGM1261JGM127!GM128�JGM12 m <br /> _ R <br /> I I I I I I <br /> BLDG 40-27 <br /> PARTIAL UNDERGROUND PLAN N KEY PLAN N <br /> SCALE:1/8"=1'-0" FIN. FLR. ELEV. 92'-0° SCALE: NONE <br /> F#MEERS ISSUED FOR CONSTRUCTION8' 4' 0 4' 8' 16' <br /> PROFESSIONAL STAMP & SIGNATURE <br /> APPLIES TO WORK WITHIN THE CLOUDED Seattle//Spokane//Baltimore DESIGN BY FSi DATE 03.14.24 SCALE: 1/8" <br /> REVISION AREAS ONLY AS INDICATED <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ACCEPTABILITY DRAWN D?TE SUBTITLE CURRENT REVISION SYMBOL DATE <br /> RECORD DRAWING ISSUED TO OWNER MGM DJH 06.30.94 E 737 NORTH LINE - HYDRAULICS W8861360 FSi KMC 01.25.24 �. <br /> "qo THIS DESIGN AND,oR C1E11ED PARTIAL PLUMBING PLAN-TUNNELS W8861360 D 03.14.24 <br /> �ti*` "�' � SPECIFICATION IS APPROVED SrleEr N <br /> A COLD WATER PIPING DEACTIVATED MJP CFH 09.11.98BOE//VG® W ENGINEER TITLE 737 NORTH LINE - 40-26 WING TANK CLEANOUT U G M 121 <br /> S APPROVED BY DEPT. DATE <br /> B 787 FA RECORD SET 555886 WH T MENIKET7I 06.22.07 e CHECRED <br /> N FSi �`� APPROVED BUILDING 40-026 JOB N0, COMP N0. <br /> C 5X5 RATE READINESS - RECORD SET 13884121 WH SAG 05.16.14 SS/ONAL EpG <br /> D 737 NORTH LINE-40-26 WING TANK CLEANOUT W8861360 FSi I KMC 1 03.14.24 APPROVED MECHANICAL MASTER COLN.7-P/3-5 EVERETT, WA DWG NG. 40-026-UGM121 <br />