My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction, Inc. 1/13/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction, Inc. 1/13/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2026 9:28:40 AM
Creation date
1/13/2026 8:48:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction, Inc.
Approval Date
1/13/2026
Council Approval Date
1/7/2026
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
36th ST CSO Storage Improvements
Tracking Number
0005068
Total Compensation
$20,955,622.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1625
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 45 00 72 00 - 45 GENERAL CONDITIONS i. Detailed description (e.g., Motor Grader Diesel Powered Caterpillar 12 “G”, Tractor Crawler ROPS & Dozer Included Diesel) ii. The hours of use or standby; and iii. The specific day and dates of use or standby; iv. Job Overhead. v. Overhead (general and administrative). vi. Subcontractor’s contract claims (in the same level of detail as specified herein is required for all Subcontractor’s contract claims); and vii. Other categories as specified by the Contractor or the Owner. 10. A notarized statement shall be submitted to the Owner's Representative containing the following language: Under the penalty of law for perjury or falsification, the undersigned, ______________________________, ______________________________ (name) (title) of ____________________________________________________________ (company) hereby certifies that the Contract Claim for an adjustment to the Contract Sum and/or Contract Time, if any, made herein for Work on this Contract is a true and complete statement of the factual basis of the Contract Claim and all actual costs incurred and time sought, and is fully documented and supported under the Contract between the parties. Date________________________________/s/ _______________________ Subscribed and sworn before me this ____________ day of _______ Notary Public My Commission Expires: ___________________________________________ 12.3 FALSE OR OMITTED INFORMATION The Contractor waives each Contract Claim for which it presents material information that it knows, or in the exercise of reasonable care should know, is false, or omits or fails to disclose material information relating to such Contract Claim. In such case, Contractor shall reimburse the Owner for any and all fees and expenses incurred in investigating any such Contract Claim. 12.4 REMEDIES 12.4.1 General If a Contract Claim has merit in whole or in part, then Contractor’s sole remedies shall be those provided in this subsection. Contractor must timely and strictly comply with the requirements of 10. NOTICE TO OWNER, 11. DIFFERING SITE CONDITIONS, 12. CONTRACT CLAIMS and all other General Conditions relating to the Contract Claim. Adjustments to Contract Time shall be determined pursuant to 5.2.2.2 Extensions of Contract Time. Failure to comply strictly and timely shall be deemed a waiver of the Contract Claim.
The URL can be used to link to this page
Your browser does not support the video tag.