Laserfiche WebLink
City of Everett 00 72 00 - 45 00 72 00 - 45 GENERAL CONDITIONS i. Detailed description (e.g., Motor Grader Diesel Powered Caterpillar 12 “G”, Tractor Crawler ROPS & Dozer Included Diesel) ii. The hours of use or standby; and iii. The specific day and dates of use or standby; iv. Job Overhead. v. Overhead (general and administrative). vi. Subcontractor’s contract claims (in the same level of detail as specified herein is required for all Subcontractor’s contract claims); and vii. Other categories as specified by the Contractor or the Owner. 10. A notarized statement shall be submitted to the Owner's Representative containing the following language: Under the penalty of law for perjury or falsification, the undersigned, ______________________________, ______________________________ (name) (title) of ____________________________________________________________ (company) hereby certifies that the Contract Claim for an adjustment to the Contract Sum and/or Contract Time, if any, made herein for Work on this Contract is a true and complete statement of the factual basis of the Contract Claim and all actual costs incurred and time sought, and is fully documented and supported under the Contract between the parties. Date________________________________/s/ _______________________ Subscribed and sworn before me this ____________ day of _______ Notary Public My Commission Expires: ___________________________________________ 12.3 FALSE OR OMITTED INFORMATION The Contractor waives each Contract Claim for which it presents material information that it knows, or in the exercise of reasonable care should know, is false, or omits or fails to disclose material information relating to such Contract Claim. In such case, Contractor shall reimburse the Owner for any and all fees and expenses incurred in investigating any such Contract Claim. 12.4 REMEDIES 12.4.1 General If a Contract Claim has merit in whole or in part, then Contractor’s sole remedies shall be those provided in this subsection. Contractor must timely and strictly comply with the requirements of 10. NOTICE TO OWNER, 11. DIFFERING SITE CONDITIONS, 12. CONTRACT CLAIMS and all other General Conditions relating to the Contract Claim. Adjustments to Contract Time shall be determined pursuant to 5.2.2.2 Extensions of Contract Time. Failure to comply strictly and timely shall be deemed a waiver of the Contract Claim.