My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction, Inc. 1/13/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction, Inc. 1/13/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2026 9:28:40 AM
Creation date
1/13/2026 8:48:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction, Inc.
Approval Date
1/13/2026
Council Approval Date
1/7/2026
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
36th ST CSO Storage Improvements
Tracking Number
0005068
Total Compensation
$20,955,622.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1625
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 46 00 72 00 - 46 GENERAL CONDITIONS 12.4.2 Extra Work 12.4.2.1 Adjustment of Contract Sum If the Contractor is entitled to an adjustment of Contract Sum because of Extra Work, the adjustment shall be calculated and paid as provided in 9.5. ADJUSTMENT OF CONTRACT SUM. This amount includes jobsite and home office Overheads for such Work, including any schedule delays relating to such Work. Therefore, no compensation in addition to that provided in 9.6. FORCE ACCOUNT shall be paid for such things as extended Overhead or other costs or damages. 12.4.2.2 Extension of Contract Time Extensions of Contract Time caused by Extra Work shall be determined as provided in 5.2.2.2 Extensions of Contract Time. 12.4.3 Delays 12.4.3. Owner Caused Delay Unrelated to Extra Work 12.4.3.1.1 Adjustment of Contract Sum If the Contractor is entitled to an adjustment of Contract Sum because of a Delay solely caused by the Owner that does not relate to Extra Work, Contractor shall only be compensated for the items below, less all funds paid pursuant to any change in the Contract Sum that contributed to the Delay: 1. Documented, incurred cost of nonproductive field supervision or labor extended because of the Delay; 2. Documented, incurred cost of home office supervision to attend jobsite meetings; 3. Documented, incurred cost of temporary facilities or equipment rental extended because of the Delay; 4. Documented, incurred cost of insurance extended because of the Delay; 5. General and administrative Overhead in an amount to be agreed upon, but not to exceed three percent (3%) of original Contract Sum divided by the Contract Time for each day of the Delay. Owner shall not owe Contractor compensation for extended Overhead or other delay costs to the extent Contractor or anyone other than the City contributed to or is concurrently responsible for the Delay. 12.4.3.1.2 Adjustment of Contract Time If the Contractor is entitled to an adjustment of Contract Time because of a Delay solely caused by the Owner that does not relate to Extra Work, Contractor shall be entitled to an adjustment of Contract Time to the extent the Delay increases the duration of the Project, as measured by the critical path and as demonstrated pursuant to the requirements of 5.2.2.2 Extensions of Contract Time. 12.4.3.2 Contractor Caused Delay If the Contractor is solely responsible for any Delay to any interim milestone, Substantial Completion, Physical Completion or the Completion Date, the Owner shall be entitled to liquidated or other damages as provided elsewhere in the Contract Documents. The Contractor accepts the risk of any Delays caused by strikes, work slowdowns, job actions and labor unrest of any kind. Contractor shall not be entitled to any increase in Contract Sum or Contract Time due to a Delay it caused. 12.4.3.3 Delays Concurrently Caused by Contractor and Owner If the Owner and the Contractor cause a Delay concurrently, neither the Owner nor the Contractor shall be liable to the other except as provided herein. 12.4.3.3.1 Adjustment of Contract Sum The Contractor shall not be entitled to any adjustment in Contract Sum for Delays concurrently caused by the Owner and the Contractor.