My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction, Inc. 1/13/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Interwest Construction, Inc. 1/13/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2026 9:28:40 AM
Creation date
1/13/2026 8:48:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction, Inc.
Approval Date
1/13/2026
Council Approval Date
1/7/2026
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
36th ST CSO Storage Improvements
Tracking Number
0005068
Total Compensation
$20,955,622.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1625
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT <br /> 36TH ST CSO STORAGE IMPROVEMENTS WO 3765-2 <br /> <br /> <br /> <br />CONTRACT MODIFICATION PW\JA\W3Y02300 <br />PROCEDURES SEPTEMBER 2025 <br />01 26 00 - 2 ©COPYRIGHT 2025 JACOBS <br />5. Estimated adjustment in price claimant believes it is entitled to with full <br />documentation and justification. <br />6. Requested Change in Contract Times: Include at least (i) Progress <br />Schedule documentation showing logic diagram for request, <br />(ii) documentation that float times available for Work have been used, <br />and (iii) revised activity logic with durations including sub-network <br />logic revisions, duration changes, and other interrelated schedule <br />impacts, as appropriate. <br />7. Documentation may be necessary as set forth below for Work Change <br />Directive, and as Engineer may otherwise require. <br />1.03 WORK CHANGE DIRECTIVES <br />A. Procedures: <br />1. Engineer will: <br />a. Initiate, including a description of the Work involved and any <br />attachments. <br />b. Affix signature, demonstrating Engineer’s recommendation. <br />c. Transmit electronic copies to Owner for authorization. <br />2. Owner will: <br />a. Affix signature, demonstrating approval of the changes involved. <br />b. Return electronic copies to Engineer, who will retain one copy, <br />send one copy to the Owner’s Representative or other field <br />representative, and forward electronic copies to Contractor. <br />3. Upon completion of Work covered by the Work Change Directive or <br />when final Contract Times and Contract Price are determined, <br />Contractor shall submit documentation for inclusion in a Change Order. <br />4. Contractor’s documentation shall include but not be limited to: <br />a. Appropriately detailed records of Work performed to enable <br />determination of value of the Work. <br />b. Full information required to substantiate resulting change in <br />Contract Times and Contract Price for Work. On request of <br />Engineer, provide additional data necessary to support <br />documentation. <br />c. Support data for Work performed on a unit price or Cost of the <br />Work basis with additional information such as: <br />1) Dates Work was performed, and by whom. <br />2) Time records, wage rates paid, and equipment rental rates. <br />3) Invoices and receipts for materials, equipment, and <br />subcontracts, all similarly documented. <br />B. Effective Date of Work Change Directive: Date of signature by Owner, unless <br />otherwise indicated thereon.
The URL can be used to link to this page
Your browser does not support the video tag.