My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/14/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthwork Solutions, LLC 1/14/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2026 2:09:51 PM
Creation date
1/14/2026 2:01:24 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/14/2026
Council Approval Date
1/7/2026
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
RRFB PEDESTRIAN SAFETY
Tracking Number
0005072
Total Compensation
$715,108.86
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
RRFB PEDESTRIAN SAFETY October 31, 2025 <br />STATE FUND # HLP-PB25(004) <br />WO 3807 <br />Page 11 of 82 <br />1 permitted under Washington Law. Such review, if any, shall be timely filed in the Superior <br />2 Court of the county where the Contracting Agency headquarters is located, provided that <br />3 where an action is asserted against a county, RCW 36.01.050 shall control venue and <br />4 jurisdiction. <br />5 <br />6 1-04.GR1 <br />7 Scope of the Work <br />8 <br />9 1-04.2.RTF <br />10 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, <br />11 Specifications, and Addenda <br />12 (December 30, 2022 APWA GSP) <br />13 <br />14 Revise the second paragraph to read: <br />15 <br />16 Any inconsistency in the parts of the contract shall be resolved by following this order of <br />17 precedence (e.g., 1 presiding over 2, 2 over 3, 3 over 4, and so forth): <br />18 1. Addenda, <br />19 2. Proposal Form, <br />20 3. Special Provisions, <br />21 4. Contract Plans, <br />22 5. Standard Specifications, <br />23 6. Contracting Agencys Standard Plans or Details (if any), and <br />24 7. WSDOT Standard Plans for Road, Bridge, and Municipal Construction. <br />25 <br />26 F1-04.4(1).docx <br />27 1-04.4(1) Minor Changes <br />28 (May 30, 2019 APWA GSP) <br />29 <br />30 Delete the first paragraph and replace it with the following: <br />31 <br />32 Payments or credits for changes amounting to *** $15,000 *** or less may be made under <br />33 the Bid item Minor Change. At the discretion of the Contracting Agency, this procedure <br />34 for Minor Changes may be used in lieu of the more formal procedure as outlined in Section <br />35 1-04.4, Changes. All Minor Change work will be within the scope of the Contract Work <br />36 and will not change Contract Time. <br />37 <br />38 F1-04.6.docx <br />39 1-04.6 Variation in Estimated Quantities <br />40 (May 25, 2006 APWA GSP; may not be used on FHWA-funded projects) <br />41 <br />42 Supplement this section with the following: <br />43 <br />44 The quantities for *** Sod Installation, and Topsoil Type B*** have been entered into the <br />45 Proposal only to provide a common proposal for bidders. Actual quantities will be <br />46 determined in the field as the work progresses, and will be paid at the original bid price, <br />47 regardless of final quantity. These bid items shall not be subject to the provisions of 1-04.6 <br />48 of the Standard Specifications. <br />49
The URL can be used to link to this page
Your browser does not support the video tag.