Laserfiche WebLink
RRFB PEDESTRIAN SAFETY October 31, 2025 <br />STATE FUND # HLP-PB25(004) <br />WO 3807 <br />Page 11 of 82 <br />1 permitted under Washington Law. Such review, if any, shall be timely filed in the Superior <br />2 Court of the county where the Contracting Agency headquarters is located, provided that <br />3 where an action is asserted against a county, RCW 36.01.050 shall control venue and <br />4 jurisdiction. <br />5 <br />6 1-04.GR1 <br />7 Scope of the Work <br />8 <br />9 1-04.2.RTF <br />10 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, <br />11 Specifications, and Addenda <br />12 (December 30, 2022 APWA GSP) <br />13 <br />14 Revise the second paragraph to read: <br />15 <br />16 Any inconsistency in the parts of the contract shall be resolved by following this order of <br />17 precedence (e.g., 1 presiding over 2, 2 over 3, 3 over 4, and so forth): <br />18 1. Addenda, <br />19 2. Proposal Form, <br />20 3. Special Provisions, <br />21 4. Contract Plans, <br />22 5. Standard Specifications, <br />23 6. Contracting Agencys Standard Plans or Details (if any), and <br />24 7. WSDOT Standard Plans for Road, Bridge, and Municipal Construction. <br />25 <br />26 F1-04.4(1).docx <br />27 1-04.4(1) Minor Changes <br />28 (May 30, 2019 APWA GSP) <br />29 <br />30 Delete the first paragraph and replace it with the following: <br />31 <br />32 Payments or credits for changes amounting to *** $15,000 *** or less may be made under <br />33 the Bid item Minor Change. At the discretion of the Contracting Agency, this procedure <br />34 for Minor Changes may be used in lieu of the more formal procedure as outlined in Section <br />35 1-04.4, Changes. All Minor Change work will be within the scope of the Contract Work <br />36 and will not change Contract Time. <br />37 <br />38 F1-04.6.docx <br />39 1-04.6 Variation in Estimated Quantities <br />40 (May 25, 2006 APWA GSP; may not be used on FHWA-funded projects) <br />41 <br />42 Supplement this section with the following: <br />43 <br />44 The quantities for *** Sod Installation, and Topsoil Type B*** have been entered into the <br />45 Proposal only to provide a common proposal for bidders. Actual quantities will be <br />46 determined in the field as the work progresses, and will be paid at the original bid price, <br />47 regardless of final quantity. These bid items shall not be subject to the provisions of 1-04.6 <br />48 of the Standard Specifications. <br />49