My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group, Inc. 1/23/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Group, Inc. 1/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:00:16 PM
Creation date
1/23/2026 3:58:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group, Inc.
Approval Date
1/23/2026
Council Approval Date
12/17/2025
End Date
12/31/2028
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
41st Street to Rucker Avenue Corridor Phase 2
Tracking Number
0005085
Total Compensation
$2,649,646.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />SCOPE OF WORK <br />Exhibit A – Scope of Services <br />City of Everett <br />41st Street Rucker Freight Corridor – Phase 2 <br />Preliminary and Final Design and Construction Support Services <br />Introduction and Background <br />The freight corridor improvements in City of Everett are being developed and <br />constructed in several phases. <br />Phase 1: City of Everett prepared a Freight Access and Mobility Study in 2009 that <br />identified improvements along 41st Street, Rucker Avenue, Pacific Avenue, and W. <br />Marine View Drive for freight travel through Everett and to/from the Port of Everett. <br />Phase 1 of the 41st Street Rucker Avenue freight improvements has been constructed. <br />Phase 2: Since phase 1 improvements, the City has been redeveloping the downtown <br />area and considering further improvements for freight mobility that would also improve <br />safety for all users. In 2024, they completed the planning for Phase 2, which identified <br />and evaluated concepts to improve freight mobility along the study corridor. The <br />preferred concept includes improvements at four intersections along the corridor: <br />•41st Street/Rucker Avenue <br />•Pacific Avenue/Grand Avenue <br />•Pacific Avenue/W. Marine View Drive <br />•W. Marine View Drive/Terminal Avenue <br />Table 1: Description of Preferred Design Concepts <br />Design <br />Concept <br />Intersection Location Description <br />2A.2 3 W Marine View <br />Drive/Pacific <br />Avenue <br />Reorientation of W Marine View <br />Dr/Pacific Ave intersection – West <br />shift, with Grand Ave <br />2A.2 2 Grand <br />Avenue/Pacific <br />Avenue <br />Grand Ave pedestrian safety <br />changes <br />3A 4 W Marine View <br />Drive/Terminal Ave <br />Intersection Improvements at W <br />Marine View Dr/Terminal Ave <br />intersection – Eastbound right
The URL can be used to link to this page
Your browser does not support the video tag.