Laserfiche WebLink
Exhibit A (Scope of Work) <br />SCOPE OF WORK <br />Exhibit A – Scope of Services <br />City of Everett <br />41st Street Rucker Freight Corridor – Phase 2 <br />Preliminary and Final Design and Construction Support Services <br />Introduction and Background <br />The freight corridor improvements in City of Everett are being developed and <br />constructed in several phases. <br />Phase 1: City of Everett prepared a Freight Access and Mobility Study in 2009 that <br />identified improvements along 41st Street, Rucker Avenue, Pacific Avenue, and W. <br />Marine View Drive for freight travel through Everett and to/from the Port of Everett. <br />Phase 1 of the 41st Street Rucker Avenue freight improvements has been constructed. <br />Phase 2: Since phase 1 improvements, the City has been redeveloping the downtown <br />area and considering further improvements for freight mobility that would also improve <br />safety for all users. In 2024, they completed the planning for Phase 2, which identified <br />and evaluated concepts to improve freight mobility along the study corridor. The <br />preferred concept includes improvements at four intersections along the corridor: <br />•41st Street/Rucker Avenue <br />•Pacific Avenue/Grand Avenue <br />•Pacific Avenue/W. Marine View Drive <br />•W. Marine View Drive/Terminal Avenue <br />Table 1: Description of Preferred Design Concepts <br />Design <br />Concept <br />Intersection Location Description <br />2A.2 3 W Marine View <br />Drive/Pacific <br />Avenue <br />Reorientation of W Marine View <br />Dr/Pacific Ave intersection – West <br />shift, with Grand Ave <br />2A.2 2 Grand <br />Avenue/Pacific <br />Avenue <br />Grand Ave pedestrian safety <br />changes <br />3A 4 W Marine View <br />Drive/Terminal Ave <br />Intersection Improvements at W <br />Marine View Dr/Terminal Ave <br />intersection – Eastbound right