My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group, Inc. 1/23/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Group, Inc. 1/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:00:16 PM
Creation date
1/23/2026 3:58:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group, Inc.
Approval Date
1/23/2026
Council Approval Date
12/17/2025
End Date
12/31/2028
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
41st Street to Rucker Avenue Corridor Phase 2
Tracking Number
0005085
Total Compensation
$2,649,646.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />• Final Cultural Resources Assessment Report for WSDOT and DAHP <br />concurrence (electronic only) <br />• KMZ of 100-foot (30 meter) buffers around any recommended archaeology <br />avoidance areas <br />SEPA Documentation <br />The Consultant will prepare a Draft SEPA Checklist for submittal to the City for one <br />round of review as the SEPA lead agency, in compliance with Everett Municipal Code <br />Chapter 19.43. The SEPA Checklist will be prepared based upon desktop review of <br />publicly available information, data provided by the City, technical documentation <br />described in this Scope of Services, and one field visit conducted by two Consultant <br />staff. A final SEPA Checklist will be submitted addressing City comments. <br />The checklist will address the questions included in Washington Administrative Code <br />(WAC) 197-11-960, also found on the City of Everett SEPA Environmental Checklist. <br />The Consultant will complete the environmental elements section of the checklist. No <br />additional technical studies will be included aside from those described in this scope of <br />work. <br />Assumptions: <br />• No City preapplication meetings will be scheduled or conducted by the <br />CONSULTANT. SEPA submittal and feedback with Everett will be assumed to be <br />handled by CLIENT staff along with clarification of any local City of Everett permit <br />needs. <br />• Critical areas are not present on-site that trigger the need for preparation of a <br />critical areas report in support of SEPA. <br />• The project will qualify for a SEPA Mitigated Determination of Non-Significance. <br />The project will not result in potentially significant impacts and the City will not <br />require an Environmental Impact Statement. <br />• The City will fulfill public notice requirements associated with SEPA. <br />• The project does not require compliance with the Healthy Environmental for All <br />(HEAL) Act because the total project cost is less than $15 million. <br />• No federal nexus exists for this project; the project will thus not be subject to <br />compliance with the National Environmental Policy Act (NEPA). <br />Deliverables: <br />• Draft SEPA checklist application (electronic) <br />• One electronic version and 1 hardcopy of the final SEPA checklist following one <br />round of review for submittal to the City of Everett
The URL can be used to link to this page
Your browser does not support the video tag.