My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group, Inc. 1/23/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Group, Inc. 1/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:00:16 PM
Creation date
1/23/2026 3:58:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group, Inc.
Approval Date
1/23/2026
Council Approval Date
12/17/2025
End Date
12/31/2028
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
41st Street to Rucker Avenue Corridor Phase 2
Tracking Number
0005085
Total Compensation
$2,649,646.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />drainage report will include a written assessment and summary of the surface water <br />design approach and features on the project, summary of tables, flow control and water <br />quality treatment calculations, pipe capacity calculations, drainage basin maps, <br />backwater analysis (Hydraulic Grade Line), and supporting exhibits. <br />Deliverables: <br />• Draft Drainage Report at 60% PS&E phase (PDF) <br />• Final Drainage Report at 90% PS&E phase (PDF) <br />• Final Drainage Report (updated) at 100% PS&E phase (PDF) <br />• Final Drainage Report (updated and signed) for Ad-ready set (PDF) <br />Drainage Plans <br />Consultant will prepare drainage plans, profiles, and details for the proposed roadway <br />improvements at each PS&E submittal. In conjunction with the drainage design, <br />Consultant will assist the design team in the development of technical specifications and <br />cost estimates related to the Drainage design. <br />Assumptions: <br />• Drainage design will be based on the assumptions and analyses presented in the <br />Drainage Report. <br />Deliverables: <br />• Drainage PS&E at 30% (Prelim), 60%, 90%, 100% and Ad-ready design levels. <br />Temporary Erosion and Sediment Control (TESC) Plans <br />Consultant will prepare Temporary Erosion and Sediment Control plans which outline <br />and identify measures and details for proposed erosion and sedimentation controls <br />measures to be used for this project. In conjunction with the TESC design, Consultant <br />will assist the design team in the development of technical specifications and cost <br />estimates related to TESC. <br />Assumptions: <br />• TESC design will be based upon the ground disturbance, project limits, removals <br />and impacts shown in the site preparation plans. <br />Deliverables: <br />• TESC PS&E at 60%, 90%, 100% and Ad-ready design levels <br />
The URL can be used to link to this page
Your browser does not support the video tag.