My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group, Inc. 1/23/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Group, Inc. 1/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:00:16 PM
Creation date
1/23/2026 3:58:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group, Inc.
Approval Date
1/23/2026
Council Approval Date
12/17/2025
End Date
12/31/2028
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
41st Street to Rucker Avenue Corridor Phase 2
Tracking Number
0005085
Total Compensation
$2,649,646.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />• Traffic Signal Improvements Signal Pole – Steel Schedule and Details (up to six <br />(6) sheets) <br />• Traffic Signal Improvements Intersection Plan - APS Only (up to two (2) sheets) <br />ITS Plans <br />This task includes ITS design to modify the existing interconnect infrastructure based on <br />modifications to the traffic signals, pull boxes, and conduits noted above. The proposed <br />ITS plans may also include up to two (2) additional detection cameras for enhanced <br />truck detection. ITS plans will note existing and new conduits and junction boxes. Wiring <br />schedules and details will be included in the Traffic Signal Wiring Schedule noted <br />above. The ITS design will be coordinated with the signal design. <br />The ITS design is anticipated to be completed based on the improvements referenced <br />above and the ITS plans are anticipated to consist of the following sheets: <br />• Interconnect Plan (up to three (3) sheets). <br />Assumptions: <br />• Existing intersections are currently connected with fiber optic interconnect. <br />• All splice diagrams will be provided by the City. <br />Lighting Design and Plans <br />Consultant will prepare lighting analysis and design at the project intersections per City <br />standards and requirements. Photometric modeling will be performed under this task to <br />confirm the proposed light locations meet City Standards. Modeling will be based on <br />City approved light fixtures. Lighting plans include light level analysis, location of new or <br />relocated street and pedestrian poles and luminaries, cable, conduit, and junction boxes <br />for the lighting system. It is assumed new or relocated lights will be connected to <br />existing services. <br />The lighting design is anticipated to be completed based on the improvements at the <br />intersections referenced above and the lighting plans are anticipated to consist of the <br />following sheets: <br />• Lighting General Notes (up to one (1) sheet) <br />• Photometric Analysis (up to four (4) sheets) <br />• Lighting Layout Plan (up to four (4) sheets) <br />• Lighting Details and Schedules (up to three (3) sheets) <br />Assumptions: <br />• Splice diagrams will be provided by the City <br />• The plans will conform with MUTCD and/or WSDOT/City procedures and <br />standard plans
The URL can be used to link to this page
Your browser does not support the video tag.