My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group, Inc. 1/23/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Group, Inc. 1/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:00:16 PM
Creation date
1/23/2026 3:58:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group, Inc.
Approval Date
1/23/2026
Council Approval Date
12/17/2025
End Date
12/31/2028
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
41st Street to Rucker Avenue Corridor Phase 2
Tracking Number
0005085
Total Compensation
$2,649,646.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />Task 12 – Traffic Control Design <br />This task includes providing traffic control plans for the Contractor’s use in constructing <br />the proposed roadway improvements. <br />Traffic Control Design <br />The Consultant will prepare traffic control plans and detour plans as described below. <br />The consultant will also analyze any detour or lane reductions for impacts to the traffic <br />operations. The plans will conform with MUTCD and/or WSDOT/City procedures and <br />standard plans. One round of review comments and edits is assumed at both the 90% <br />and 100% design level, up to two (2) total. <br />Consultant will develop traffic control strategy and support stakeholder engagement as <br />needed to develop traffic control plans around safety and efficiency, work hours, and <br />general code specifications. <br />Assumptions: <br />Concept 2A.2 - W Marine View Drive at Pacific Avenue <br />• Traffic accessible: (up to 28 sheets) <br />o TCPs: <br /> Lane closures across north leg of W Marine View Drive (up to 4 <br />sheets) <br /> Lane closures across west leg of Pacific Avenue (up to 2 sheets) <br /> Lane closures across east leg of Pacific Avenue (up to 3 sheets) <br /> Lane closures across east and west leg of Pacific Avenue at Grand <br />Avenue (up to 2 sheets) <br /> Full closure at south leg of W Marine View Drive (up to 1 sheet) <br /> Full closure at south leg of Grand Avenue (up to 1 sheet) <br /> Full intersection closure (temporary night) for crosswalk restriping <br />at W Marine View Drive at Pacific Avenue (up to 2 sheets) <br /> Full intersection closure (temporary night) for crosswalk restriping <br />at Grand Avenue at Pacific Avenue (up to 2 sheets) <br />o Roadway Detours <br /> Detour for south leg of W Marine View Drive (up to 1 sheet) <br /> Detour for south leg of Grand Avenue (up to 1 sheet) <br /> Detour for full closure at W Marine View Drive and Pacific Avenue <br />(up to 2 sheets)
The URL can be used to link to this page
Your browser does not support the video tag.