Laserfiche WebLink
Exhibit A (Scope of Work) <br />Task 12 – Traffic Control Design <br />This task includes providing traffic control plans for the Contractor’s use in constructing <br />the proposed roadway improvements. <br />Traffic Control Design <br />The Consultant will prepare traffic control plans and detour plans as described below. <br />The consultant will also analyze any detour or lane reductions for impacts to the traffic <br />operations. The plans will conform with MUTCD and/or WSDOT/City procedures and <br />standard plans. One round of review comments and edits is assumed at both the 90% <br />and 100% design level, up to two (2) total. <br />Consultant will develop traffic control strategy and support stakeholder engagement as <br />needed to develop traffic control plans around safety and efficiency, work hours, and <br />general code specifications. <br />Assumptions: <br />Concept 2A.2 - W Marine View Drive at Pacific Avenue <br />• Traffic accessible: (up to 28 sheets) <br />o TCPs: <br /> Lane closures across north leg of W Marine View Drive (up to 4 <br />sheets) <br /> Lane closures across west leg of Pacific Avenue (up to 2 sheets) <br /> Lane closures across east leg of Pacific Avenue (up to 3 sheets) <br /> Lane closures across east and west leg of Pacific Avenue at Grand <br />Avenue (up to 2 sheets) <br /> Full closure at south leg of W Marine View Drive (up to 1 sheet) <br /> Full closure at south leg of Grand Avenue (up to 1 sheet) <br /> Full intersection closure (temporary night) for crosswalk restriping <br />at W Marine View Drive at Pacific Avenue (up to 2 sheets) <br /> Full intersection closure (temporary night) for crosswalk restriping <br />at Grand Avenue at Pacific Avenue (up to 2 sheets) <br />o Roadway Detours <br /> Detour for south leg of W Marine View Drive (up to 1 sheet) <br /> Detour for south leg of Grand Avenue (up to 1 sheet) <br /> Detour for full closure at W Marine View Drive and Pacific Avenue <br />(up to 2 sheets)