My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group, Inc. 1/23/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Group, Inc. 1/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:00:16 PM
Creation date
1/23/2026 3:58:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group, Inc.
Approval Date
1/23/2026
Council Approval Date
12/17/2025
End Date
12/31/2028
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
41st Street to Rucker Avenue Corridor Phase 2
Tracking Number
0005085
Total Compensation
$2,649,646.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br /> Detour for full closure at Grand Avenue and Pacific Avenue (up to 2 <br />sheets) <br />o Pedestrian Detours <br /> Ped detour at W Marine View Drive and Pacific Avenue (up to 3 <br />sheets) <br /> Ped detour at Grand Avenue and Pacific Avenue (up to 2 sheets) <br />o Uniform Police Officer (UPO) needed to maintain traffic through <br />intersection during hours of construction. <br />• Intersection closure: (up to 15 sheets) <br />o TCPs: <br /> Full intersection closure at W Marine View Drive and Grand Avenue <br />at Pacific Avenue for repaving and restriping (up to 3 sheets) <br />o Roadway Detours <br /> Detour for south leg of W Marine View Drive (up to 1 sheet) <br /> Detour for south leg of Grand Avenue (up to 1 sheet) <br /> Detour for full closure at W Marine View Drive and Pacific Avenue <br />(up to 3 sheets) <br /> Detour for full closure at Grand Avenue and Pacific Avenue (up to 2 <br />sheets) <br />o Pedestrian Detours <br /> Ped detour at W Marine View Drive and Pacific Avenue (up to 3 <br />sheets) <br /> Ped detour at Grand Avenue and Pacific Avenue (up to 2 sheets) <br />Concept 3A & 3B - W Marine View Drive at Terminal Avenue/Everett Avenue <br />• TCPs: <br />o Lane closures across south leg of W Marine View Drive for restriping and <br />resurfacing (up to 4 sheets) <br />o Lane closures across west leg of Terminal Avenue (up to 1 sheet) <br />o Pavement preservation <br /> Reconstruction of through truck lanes to cement concrete paving <br />(up to 5 sheets) <br />• Pedestrian Detours
The URL can be used to link to this page
Your browser does not support the video tag.