My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group, Inc. 1/23/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Group, Inc. 1/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:00:16 PM
Creation date
1/23/2026 3:58:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group, Inc.
Approval Date
1/23/2026
Council Approval Date
12/17/2025
End Date
12/31/2028
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
41st Street to Rucker Avenue Corridor Phase 2
Tracking Number
0005085
Total Compensation
$2,649,646.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />Task 14 – Intermediate Design (60%) PS&E Submittal <br />This task includes preparation of construction plans, specifications outline, and an <br />opinion of cost estimate based on the comments received from the City on the 30% <br />submittal deliverables. <br />Response to 30% Comments <br />Consultant will attend one (1) comment review meeting with City staff and provide the <br />City with written responses to the City’s comments. Responses will be provided on the <br />comment documents provided by the City. <br />60% Plans <br />Consultant design team will prepare 60% design level construction plans and submit <br />them to the City. The plans will be prepared to a level of competency presently <br />maintained by practicing professionals in the field of transportation engineering in the <br />Puget Sound Region. <br />It is anticipated that the 60% plans will consist of the following sheets: <br />• Cover Sheet with Vicinity Map and Sheet Index <br />• Survey Control, Alignment, and ROW Plan <br />• Site Preparation Plan <br />• Temporary Erosion and Sediment Control (TESC) Plan <br />• Typical Roadway Sections <br />• Paving Plan and Profile <br />• Curb Ramp and Driveway Details <br />• Drainage Plan and Profile <br />• Drainage Details <br />• Utility Plan <br />• Traffic Signal Plan <br />• Lighting and ITS Plan <br />• Striping Plan <br />• Landscape Plan <br />• Retaining Wall Plan
The URL can be used to link to this page
Your browser does not support the video tag.