My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group, Inc. 1/23/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Group, Inc. 1/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:00:16 PM
Creation date
1/23/2026 3:58:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group, Inc.
Approval Date
1/23/2026
Council Approval Date
12/17/2025
End Date
12/31/2028
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
41st Street to Rucker Avenue Corridor Phase 2
Tracking Number
0005085
Total Compensation
$2,649,646.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />60% Specification Outline <br />Consultant design team will prepare a specifications outline based upon the 60% design <br />using the WSDOT Standard Specifications. <br />60% Opinion of Cost Estimate <br />Consultant design team will calculate 60% design level quantities and prepare an <br />opinion of construction costs based upon the 60% construction plans and current unit <br />bid prices. A contingency will be included to accommodate additional construction costs <br />not yet specifically identified. <br />60% QA/QC of Deliverables <br />An internal Consultant quality assurance/quality control review of deliverables will be <br />conducted prior to submittal to the City, as well as confirmation that comments received <br />have been addressed. A record of comments received will be maintained. Response to <br />each comment received will be tracked to confirm that they have been addressed. <br />Assumptions: <br />• Design details will not be included in the 60% plans. <br />• Signing Plan and Traffic Control Plan will not be included in 60% plans. <br />• 30% plan review comments from City staff will be consolidated by the City and <br />conflicting comments will be resolved by City staff prior to transmitting to <br />Consultant. <br />• Comment responses will be provided on the original comment document <br />provided by the City. <br />• Consultant will attend one (1) comment review meeting held virtually. <br />• Draft technical specifications will not be provided at the 60% design-level. <br />• Preparation of a basis of design or design report for the project is not included in <br />this scope of services. <br />Deliverables: <br />• Responses to 30% comments <br />• 60% design-level plans (PDF) <br />• 60% design-level opinion of cost summary (Excel) <br />• Specification outline (PDF) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.