<br />Lenora Regional SW Facility Division P – Proposal Nov. 2025 <br />Work Order # UP3792 SP - xli <br />Category 2: For official use only / disclosure permissible by law. <br />DIVISION B - BID ITEM DESCRIPTIONS <br /> Mobilization <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid for mobilization shall constitute complete compensation for all of Contractor’s <br />preconstruction costs of preparatory work and operations including, but not limited to, those necessary <br />for the movement of the Contractor’s personnel, equipment, supplies and incidentals to the Project; for <br />the establishment of its offices, buildings and other facilities necessary for Work on this Project; for <br />premiums on bonds and insurance for the Project, and for Work and operations that the Contractor must <br />perform or costs it must incur before beginning production work on the various items on the Project. <br />Mobilization also includes, but is not limited to, posting construction identification signs, securing <br />permits, establishing safety and security measures, preparing a traffic control plan(s), preconstruction <br />photographs, developing a Schedule of Values for lump sum bid items, submitting the project schedule <br />and providing product and material submittals, and posting of notices and jobsite posters as required <br />by WSDOT 1-07.9(2). Also include mobilization costs for all subcontracted work along with all costs for <br />utility coordination noted on the Plans and in the Specifications. <br />Items not included in this item include, but are not limited to: <br />a) Work covered by a specific bid item or Work that is to be included in a bid item or items. <br />b) Profit, interest on borrowed money, overhead or management costs. <br />Partial payments will be made for the lump sum contract price for “Mobilization” as follows: <br />a) (a) When 5% of the total original contract amount is earned from other bid items, 50% of the <br />amount bid for mobilization, or 5% of the total original contract amount, whichever is the least, <br />will be paid. <br />b) (b) When 10% of the total original contract amount is earned from other bid items. 100% of <br />the amount bid for mobilization, or 10% of the total contract amount, whichever is the least, will <br />be paid. <br />Upon substantial completion, payment of any amount bid for mobilization in excess of 10% of the total <br />original contract amount will be paid. <br /> Surveying <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid for surveying includes, but is not limited to, all costs associated with furnishing all <br />labor, tools, survey instruments materials, and other equipment necessary for setting and monitoring <br />the location, elevation, alignment and grade of the Work as specified in 1-05.4 CONFORMITY WITH <br />AND DEVIATIONS FROM PLANS AND STAKES and the Plans. <br />The lump sum bid item also includes, but is not limited to, all costs associated with furnishing all labor, <br />tools, survey instruments, materials and other equipment necessary for verifying the rim and invert <br />elevations, prior to construction, of all existing manholes and pipes where connections are to be made. <br />The lump sum also includes, but is not limited to, all costs associated with furnishing all labor, tools, <br />survey instruments, materials and other equipment necessary for obtaining the “as constructed” location <br />and elevations of the Work, in particular, sewer pipe invert elevations and other information necessary