Laserfiche WebLink
<br />Lenora Regional SW Facility Division P – Proposal Nov. 2025 <br />Work Order # UP3792 SP - xlii <br />Category 2: For official use only / disclosure permissible by law. <br />for production of the Record Drawing (As-Constructed) documents meeting the requirements defined <br />in RECORD DRAWINGS of these Special Provisions. <br />Partial payments will be made for the lump sum contract price for “Surveying” as follows: <br />a) When 10% of the total original contract amount is earned from other bid items, 50% of the <br />amount bid for surveying will be paid. <br />When redlines are received for preparing RECORD DRAWINGS, including all information <br />described above, 100% of the amount bid for surveying will be paid. <br /> SPCC Plan <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid for the Spill Prevention, Control and Countermeasures (SPCC) Plan includes, but is <br />not limited to, all costs associated with complying with the requirements of Section 1-07.15(1) of the <br />Standard Specification. <br /> Force Account <br />Measurement and Payment: Force Account (FA ) <br />This Force Account bid item shall be accomplished in accordance with 1-09.6 FORCE ACCOUNT; <br />except, as modified below. <br />The Force Account bid item has been included for specific miscellaneous work items listed below and <br />for any additional work directed by the Engineer that is not required by the original Contract and to <br />address changed conditions or unanticipated work. The amount indicated in the Proposal for this bid <br />item is to provide a common bid amount. The actual amount paid under this bid item may vary from no <br />payment to the full amount of the bid item. Work performed under this bid item will be initiated with a <br />work directive issued by the Engineer, except work described in items (a) and (b) below, which may be <br />initiated by the Inspector in the field. <br />In lieu of the preceding prescribed method of determining payment for Force Account work, payment <br />may be made at unit prices or lump sum prices agreed to by the Engineer and the Contractor prior to <br />beginning the Force Account work. <br />The following miscellaneous construction work will be paid for by Force Account as specified in 1-09.6 <br />FORCE ACCOUNT. For the purpose of providing a common Proposal for all Bidders, and for that <br />purpose only, the City has estimated an amount and included it in the bid item for Force Account work <br />to become part of the total Bid by the Contractor. <br />a) Cost for additional excavation, fittings, and labor to make grade adjustments to the new <br />watermain for unknown underground conflicts and conflicts due to being unmarked or <br />mismarked utilities in the field. <br />b) Restoration of existing special private improvements including, but not limited to, brick or stone <br />walkways, decorative concrete walks or driveways, concrete masonry or stone walls, rockeries, <br />fences, landscape plantings, including but not limited to, hedges, trees, flowerbeds, irrigation <br />systems, yard lighting, rockeries, retaining walls, or steps. <br />c) Pavement Patching and site access restoration <br />d) Adjustment to utility lids/covers, catch basin or manhole grates/covers to finished grade, reset <br />disturbed survey benchmark or monuments.