My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, Inc. 2/4/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, Inc. 2/4/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 11:26:52 AM
Creation date
2/4/2026 11:05:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, Inc.
Approval Date
2/4/2026
Council Approval Date
1/28/2026
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lenora Regional Stormwater Facility
Public Works WO Number
UP3792
Tracking Number
0005101
Total Compensation
$5,905,272.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
781
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Lenora Regional SW Facility Division P – Proposal Nov. 2025 <br />Work Order # UP3792 SP - xlii <br />Category 2: For official use only / disclosure permissible by law. <br />for production of the Record Drawing (As-Constructed) documents meeting the requirements defined <br />in RECORD DRAWINGS of these Special Provisions. <br />Partial payments will be made for the lump sum contract price for “Surveying” as follows: <br />a) When 10% of the total original contract amount is earned from other bid items, 50% of the <br />amount bid for surveying will be paid. <br />When redlines are received for preparing RECORD DRAWINGS, including all information <br />described above, 100% of the amount bid for surveying will be paid. <br /> SPCC Plan <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid for the Spill Prevention, Control and Countermeasures (SPCC) Plan includes, but is <br />not limited to, all costs associated with complying with the requirements of Section 1-07.15(1) of the <br />Standard Specification. <br /> Force Account <br />Measurement and Payment: Force Account (FA ) <br />This Force Account bid item shall be accomplished in accordance with 1-09.6 FORCE ACCOUNT; <br />except, as modified below. <br />The Force Account bid item has been included for specific miscellaneous work items listed below and <br />for any additional work directed by the Engineer that is not required by the original Contract and to <br />address changed conditions or unanticipated work. The amount indicated in the Proposal for this bid <br />item is to provide a common bid amount. The actual amount paid under this bid item may vary from no <br />payment to the full amount of the bid item. Work performed under this bid item will be initiated with a <br />work directive issued by the Engineer, except work described in items (a) and (b) below, which may be <br />initiated by the Inspector in the field. <br />In lieu of the preceding prescribed method of determining payment for Force Account work, payment <br />may be made at unit prices or lump sum prices agreed to by the Engineer and the Contractor prior to <br />beginning the Force Account work. <br />The following miscellaneous construction work will be paid for by Force Account as specified in 1-09.6 <br />FORCE ACCOUNT. For the purpose of providing a common Proposal for all Bidders, and for that <br />purpose only, the City has estimated an amount and included it in the bid item for Force Account work <br />to become part of the total Bid by the Contractor. <br />a) Cost for additional excavation, fittings, and labor to make grade adjustments to the new <br />watermain for unknown underground conflicts and conflicts due to being unmarked or <br />mismarked utilities in the field. <br />b) Restoration of existing special private improvements including, but not limited to, brick or stone <br />walkways, decorative concrete walks or driveways, concrete masonry or stone walls, rockeries, <br />fences, landscape plantings, including but not limited to, hedges, trees, flowerbeds, irrigation <br />systems, yard lighting, rockeries, retaining walls, or steps. <br />c) Pavement Patching and site access restoration <br />d) Adjustment to utility lids/covers, catch basin or manhole grates/covers to finished grade, reset <br />disturbed survey benchmark or monuments.
The URL can be used to link to this page
Your browser does not support the video tag.