KLB Construction, Inc. 2/4/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, Inc. 2/4/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 11:26:52 AM
Creation date
2/4/2026 11:05:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, Inc.
Approval Date
2/4/2026
Council Approval Date
1/28/2026
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lenora Regional Stormwater Facility
Public Works WO Number
UP3792
Tracking Number
0005101
Total Compensation
$5,905,272.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
781
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Lenora Regional SW Facility Division P – Proposal Nov. 2025 <br />Work Order # UP3792 SP - l <br />Category 2: For official use only / disclosure permissible by law. <br />Measurement and Payment: Lump Sum (LS) <br />Measurements shall meet the requirements of 1-09.1. The contract unit price shall be full payment for <br />furnishing the tools, labor, equipment, and materials required for the excavation, removal and disposal <br />of existing soils, backfill, compaction, and other work required. The work also includes all costs in <br />connection with design and submittal of the shoring system, predrilling and the equipment and labor <br />necessary to install shoring. <br />Shoring not shown on the plans or that is installed by the Contractor to protect areas adjacent to 1st <br />Avenue and Lenora Street adjacent to the SW Treatment Facility while the structures are under <br />construction is considered incidental to the project and no separate payment shall be made. <br />Extra excavation may not be used in lieu of constructing the shoring where it is indicated on the plans. <br />The contract price shall be full payment for furnishing the tools, labor, equipment, and materials required <br />for the excavation, backfill, and compaction necessary for installation of storm sewer main in <br />accordance with the plans, specifications, and geotechnical report. <br />This item does NOT include excavation and backfill within the standard pipe trench pipe zone and <br />backfill for utility trenches footprint outlined in the typical trench sections of the standard plans, and pipe <br />installation specifications. <br />If the Engineer requires shoring, cofferdams or caissons when the contract provides no bid item for <br />such work, the Contracting Agency will pay as provided in Section 1-04.4. <br />The cost for geosynthetic filter fabric, drains, and construction of the structural drainage system is <br />considered incidental to the project. <br />Unless included as a separate bid item, the use of Controlled Density Fill (CDF) in place of normal <br />backfill shall be considered a convenience to the Contractor, and as such, the costs associated with <br />CDF shall be incidental to the project. <br /> Dewatering Structures – Lenora Flow Split Vault <br />Measurement and Payment: Lump Sum (LS) <br />Measurements shall meet the requirements of 1-09.1. The unit price for Dewatering shall be full <br />compensation for dewatering plan submittals and coordination, furnishing all material, equipment, tools, <br />and labor necessary to dewater the excavations on the project in accordance with Section 2-09, the <br />site-specific dewatering plan per Section 2-09.3(1), and in accordance with the ECY, state and local <br />regulatory requirements. Other items included, but is not limited to, this work are: <br />1. Coordination, preparation, submittal, and implementation of the Dewatering Plan that entails <br />how water from dewatering operations will be handled and disposed of. Including costs <br />associated with submitting and obtaining written approvals from the City for use of their sites <br />and facilities. <br />2. Designing, furnishing, operating, and maintaining the pumps and pumping systems. <br />3. TV inspection, cleaning, flushing, and decontamination of the City sewer facilities following <br />pumping operations. Additional cleaning and inspections required will be at the Contractor’s <br />expense. <br />4. Providing storage tanks with sizing and design to settle and store stormwater for TESC treatment <br />system and for the discharge flow rate. <br />5. The cost for the treatment system is included under TESC treatment system bid item. <br /> Crushed Surfacing Top Course