My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, Inc. 2/4/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, Inc. 2/4/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 11:26:52 AM
Creation date
2/4/2026 11:05:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, Inc.
Approval Date
2/4/2026
Council Approval Date
1/28/2026
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lenora Regional Stormwater Facility
Public Works WO Number
UP3792
Tracking Number
0005101
Total Compensation
$5,905,272.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
781
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Lenora Regional SW Facility Division P – Proposal Nov. 2025 <br />Work Order # UP3792 SP - lii <br />Category 2: For official use only / disclosure permissible by law. <br />Measurement and Payment: Lump Sum (LS) <br />Measurements shall meet the requirements of 1-09.1. Unit price per lump sum shall be full <br />compensation for furnishing all tools labor, equipment, and material to install, construct, finish and <br />perform the work as specified and indicated on the drawings including but not limited to concrete, <br />reinforcement, forms, overlay slabs and access “chimneys”, grouting, sealing, channelization and other <br />work necessary to construct the concrete structure as indicated on the drawings and these <br />specifications. Concrete structures also includes furnishing and installation of access hatches and <br />lockable solid lid covers, furnishing and installation of stainless steel plate covering the 24” effluent pipe. <br />Crushed base for the base leveling pad will be paid for under the Crushed Surfacing Top Course bid <br />item and no separate payment will be made. <br />Installation of fabric and trench drains, or other separation and drain items are considered part of the <br />Concrete Structure and no separate payment will be made. <br />Payment for weep hole work shall be considered incidental to the total work. <br /> Reinforced Conc. Walls – Stormwater Facility <br /> Reinforced Conc. Walls – Viewing Platform <br />Measurement and Payment: Lump Sum (LS). <br />Measurements shall meet the requirements of 1-09.1. Unit price per lump sum for bid items 34 & 35 <br />shall be full compensation for furnishing all tools labor, equipment, and material to install, construct, <br />finish and perform the work as specified and indicated on the structural and civil drawings and Division <br />6 of the Contract specifications including but not limited to concrete, reinforcement, forms, overlay slabs <br />and grouting, sealing, channelization, concrete banding and all wall finishing, colorization, anti-graffiti <br />and coatings (not specifically listed under Concrete Wall Treatment bid item) and other work necessary <br />to construct the Lenora Stormwater Facility reinforced concrete walls and channel structures as <br />indicated on the drawings and these specifications. Fabric and trench drains, weep hole work, or other <br />separation and drain items are considered part of the Concrete Structure and no separate payment will <br />be made. The work also includes construction of the wall drain in accordance with Structural drawings, <br />Civil Drawings, and WSDOT standard plan D-4, and Contract specifications. Crushed base for the base <br />leveling pad and gravel backfill for wall construction will be paid for under their respective bid items and <br />no separate payment will be made. Ground improvements, where not specifically called out or listed <br />under a separate bid item shall be included and no separate payment will be made. <br /> Concrete Wall Treatment <br />Measurement and Payment: Square Foot (SF) <br />Measurement shall be per square foot face of wall treatment and shall meet the requirements of 1-09.1. <br />The unit price shall be full compensation for furnishing all tools labor, equipment, and material to <br />construct the form liner finished concrete face finish and perform the work as indicated on the structural <br />and landscape drawings and of the Contract specifications. <br />Construction of the 4” concrete banding will be paid for under the Reinforced Concrete Wall bid items <br />and is not included with this item. <br /> Storm Sewer Pipe 8 IN. Dia
The URL can be used to link to this page
Your browser does not support the video tag.