My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, Inc. 2/4/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, Inc. 2/4/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 11:26:52 AM
Creation date
2/4/2026 11:05:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, Inc.
Approval Date
2/4/2026
Council Approval Date
1/28/2026
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lenora Regional Stormwater Facility
Public Works WO Number
UP3792
Tracking Number
0005101
Total Compensation
$5,905,272.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
781
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Lenora Regional SW Facility Division P – Proposal Nov. 2025 <br />Work Order # UP3792 SP - lxii <br />Category 2: For official use only / disclosure permissible by law. <br />Measurement shall be per linear foot as measured along face of the installed fence and shall be full <br />pay for all equipment, labor and materials to obtain, install, maintain, and remove the item as <br />specified. Once removed the item shall remain the property of the Contractor. <br /> Bark or Wood Chip Mulch <br />Measurement and Payment: Cubic Yard (CY) <br />Measurements shall meet the requirements of 1-09.1. The cubic yard bid item shall be measured as <br />in-place at the thicknesses listed in the Landscape Plans and no additional payment will be made for <br />quantities outside of plan quantity. Costs include providing the source of material, loading, hauling, <br />intermediate windrowing, stockpiling, placing, spreading, processing, and compacting. <br />Mulch for the stormwater treatment facility cells is paid for under Bid Item Stormwater Treatment System <br />and no separate payment will be made. <br /> Seeding, Fertilizing and Mulching – Eco-Lawn Mix <br /> Seeding, Fertilizing and Mulching – Wildflower Mix <br />Measurement and Payment: Square Yard (SY) <br />Measurements shall meet the requirements of 1-09.1. The unit contract price per square yard shall be <br />for replacement in kind including for weed control within the seeding or sodding area, to prepare the <br />area, plant, erect barriers, and establish seeded areas and for furnishing the labor, tools, equipment, <br />and materials necessary to complete the work as specified. <br /> Seeded Lawn Installation <br />Measurement and Payment: Square Yard (SY) <br />Measurements shall meet the requirements of 1-09.1. The unit contract price per square yard shall be <br />for replacement in kind including for weed control within the seeding or sodding area, to prepare the <br />area, plant, erect barriers, and establish seeded areas and for furnishing the labor, tools, equipment, <br />and materials necessary to complete the work as specified. <br /> Topsoil Type A <br />Measurement and Payment: Cubic Yard (CY) <br />Measurements shall meet the requirements of 1-09.1. The cubic yard bid item shall be measured as <br />in-place at the thicknesses listed in the Landscape and Civil drawings and no additional payment will <br />be made for quantities outside of plan quantity. The bid item shall be full payment for providing the <br />source of material for topsoil Type A, for pre-excavation weed control, excavating, loading, hauling, <br />intermediate windrowing, stockpiling, weed control on stockpiles or windrows, and removal, placing, <br />spreading, processing, cultivating, and compacting topsoil Type A. <br /> Streambed Cobbles, 6-inch <br />Measurement and Payment: Ton (TN) <br />Measurements shall meet the requirements of 1-09.1. The unit contract price per ton shall be full <br />payment for supplying, haul, washing, and placing the streambed cobbles in accordance with the plans
The URL can be used to link to this page
Your browser does not support the video tag.