Laserfiche WebLink
<br />Lenora Regional SW Facility Division P – Proposal Nov. 2025 <br />Work Order # UP3792 SP - lxii <br />Category 2: For official use only / disclosure permissible by law. <br />Measurement shall be per linear foot as measured along face of the installed fence and shall be full <br />pay for all equipment, labor and materials to obtain, install, maintain, and remove the item as <br />specified. Once removed the item shall remain the property of the Contractor. <br /> Bark or Wood Chip Mulch <br />Measurement and Payment: Cubic Yard (CY) <br />Measurements shall meet the requirements of 1-09.1. The cubic yard bid item shall be measured as <br />in-place at the thicknesses listed in the Landscape Plans and no additional payment will be made for <br />quantities outside of plan quantity. Costs include providing the source of material, loading, hauling, <br />intermediate windrowing, stockpiling, placing, spreading, processing, and compacting. <br />Mulch for the stormwater treatment facility cells is paid for under Bid Item Stormwater Treatment System <br />and no separate payment will be made. <br /> Seeding, Fertilizing and Mulching – Eco-Lawn Mix <br /> Seeding, Fertilizing and Mulching – Wildflower Mix <br />Measurement and Payment: Square Yard (SY) <br />Measurements shall meet the requirements of 1-09.1. The unit contract price per square yard shall be <br />for replacement in kind including for weed control within the seeding or sodding area, to prepare the <br />area, plant, erect barriers, and establish seeded areas and for furnishing the labor, tools, equipment, <br />and materials necessary to complete the work as specified. <br /> Seeded Lawn Installation <br />Measurement and Payment: Square Yard (SY) <br />Measurements shall meet the requirements of 1-09.1. The unit contract price per square yard shall be <br />for replacement in kind including for weed control within the seeding or sodding area, to prepare the <br />area, plant, erect barriers, and establish seeded areas and for furnishing the labor, tools, equipment, <br />and materials necessary to complete the work as specified. <br /> Topsoil Type A <br />Measurement and Payment: Cubic Yard (CY) <br />Measurements shall meet the requirements of 1-09.1. The cubic yard bid item shall be measured as <br />in-place at the thicknesses listed in the Landscape and Civil drawings and no additional payment will <br />be made for quantities outside of plan quantity. The bid item shall be full payment for providing the <br />source of material for topsoil Type A, for pre-excavation weed control, excavating, loading, hauling, <br />intermediate windrowing, stockpiling, weed control on stockpiles or windrows, and removal, placing, <br />spreading, processing, cultivating, and compacting topsoil Type A. <br /> Streambed Cobbles, 6-inch <br />Measurement and Payment: Ton (TN) <br />Measurements shall meet the requirements of 1-09.1. The unit contract price per ton shall be full <br />payment for supplying, haul, washing, and placing the streambed cobbles in accordance with the plans