My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, Inc. 2/4/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, Inc. 2/4/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 11:26:52 AM
Creation date
2/4/2026 11:05:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, Inc.
Approval Date
2/4/2026
Council Approval Date
1/28/2026
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lenora Regional Stormwater Facility
Public Works WO Number
UP3792
Tracking Number
0005101
Total Compensation
$5,905,272.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
781
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Lenora Regional SW Facility Division P – Proposal Nov. 2025 <br />Work Order # UP3792 SP - lxiii <br />Category 2: For official use only / disclosure permissible by law. <br />and specifications. This item includes coordination with the Engineer and Landscape Architect for <br />approval of the streambed cobble source prior to importing to the project. <br /> Stormwater Treatment - Unlined <br />Measurement and Payment: Lump Sum (LS) <br />Measurements shall meet the requirements of 1-09.1. Payment for the lump sum item will be limited to <br />dimensions and work limits defined on the drawings or as otherwise approved by the Engineer. <br />The lump sum price includes excavation, scarifying the soils beneath the unlined treatment cell, fine <br />grading, placing screened fill material from the site, compacting, and fine grading, all items necessary <br />for installation of Cells 3, 4, & 5, of the stormwater treatment facility as shown on the plans, described <br />in the contract documents, and as directed by the Engineer. <br />The costs for mass excavating, screening, and temporarily storing soils for use in the unlined stormwater <br />treatment bay shall be paid for under bid item Structure Exc. Class A, Incl. Haul – SW Treatment and <br />no additional payment will be made for this work. <br />The costs for temporary irrigation and landscape installations are to be paid for under separate bid items <br />and are not included. <br /> Stormwater Treatment System <br />Measurement and Payment: Lump Sum (LS) <br />Measurements shall meet the requirements of 1-09.1. The unit price includes construction of the <br />complete Contech Filterra treatment system including shop submittals and system design, furnishing <br />all materials, equipment and labor to install mulch, media, drain rock, perforated pipe, including <br />perforated pipe branches, geosynthetic, risers, spacers, grate inlet and items not specifically listed but <br />necessary to complete the full stormwater treatment system in accordance with the drawings, Contract <br />documents, manufacturer’s recommendations and as directed by the Engineer. The unit cost includes <br />activation, O&M documents and first year’s inspection and maintenance by Contech. <br />The costs for geomembrane liner, temporary irrigation and landscape installations are to be paid for <br />under separate bid items and are not included. <br /> Stormwater Treatment Facility HDPE Liner <br />Measurement and Payment: Square Yard (SY) <br />Measurement shall be per square yard as measured from the treatment cell surface footprint plus 3 feet <br />on each of the four sides. The measurement does not include liner overlap. Measurements shall meet <br />the requirements of 1-09.1. Payment for the square yard measurement will be limited to dimensions <br />and work limits defined on the drawings or as otherwise approved by the Engineer. <br />The unit price includes installation of the geomembrane liner (including overlap), moldable sealant, <br />HDPE Tape, vertical penetration and pipe boots, HDPE embedment strips (welded with mitered <br />corners), liner bed sand and all items necessary for a complete liner system as shown on the plans, <br />described in the contract documents, per the manufacturer’s recommendations, and as directed by the <br />Engineer. <br /> Stormwater Treatment Facility Startup and Testing
The URL can be used to link to this page
Your browser does not support the video tag.