My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Apex Mechanical LLC 2/23/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Apex Mechanical LLC 2/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 3:13:53 PM
Creation date
2/23/2026 2:49:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Apex Mechanical LLC
Approval Date
2/23/2026
Council Approval Date
2/4/2026
Department
Transit
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Station HVAC and Controls Improvements
Tracking Number
0005125
Total Compensation
$1,938,636.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 19 <br /> <br /> <br /> <br />00 72 00 - 19 GENERAL CONDITIONS <br />4. If Contractor files a petition to take advantage of any debtor's law, or to reorganize under any <br />bankruptcy chapter or law. <br />5. If Contractor repeatedly fails to make prompt payments to Subcontractors or others for labor, <br />materials, or Equipment. <br />6. If Contractor disregards laws, ordinances, rules, regulations, or orders of any public body having <br />jurisdiction. <br />7. If Contractor disregards the authority of the Owner or Owner’s Representative. <br />8. If Contractor violates in a substantial way the provisions of the Contract Documents or fails, <br />neglects, or refuses to proceed in compliance with the provisions of the Contract Documents. <br />9. If the Contractor made material misrepresentations to the Owner with respect to: (a) its <br />qualifications or those of its Subcontractors; (b) its or its subcontractors’ ability to perform the <br />Work in a timely, workmanlike manner; (c) the materials installed or to be installed; or (d) <br />progress pay estimates. <br />10. If Contractor fails to supply sufficient skilled workers or suitable materials or equipment. <br />11. If Contractor refuses or fails to prosecute the Work with such diligence as will ensure its Physical <br />Completion within the original Physical Completion time and any extensions of time which may <br />have been granted to the Contractor by change order or otherwise. <br />12. If Contractor performs Work which deviates from the Contract. <br />13. If Contractor otherwise violates in any material way any provisions or requirements of the <br />Contract. <br /> <br />After termination of the Contractor for default, the Owner may transfer performance of the Work to the <br />Contractor's surety. The Owner may exclude the Contractor from the Site and take possession of the <br />Work and all of the Contractor's tools, appliances, owned or rented construction equipment, and <br />machinery at the Site and use the same to the full extent they could be used by the Contractor. The <br />Owner may incorporate in the Work all materials and Equipment stored at the Site or for which the <br />Owner has paid the Contractor, but which are not yet on Site. In such case, the Contractor will not be <br />entitled to receive any further payment until the Work is finished. At the Owner’s sole option, Contractor <br />shall assign and transfer any contractual rights to material and Equipment to be installed, incorporated, or <br />used in the performance of the Work. Owner shall credit Contractor for the reasonable fair market rental <br />value of any and all Contractor owned equipment for so long as retained and used by the Owner. Owner <br />shall credit Contractor for all materials and supplies on Site or on order, but not yet paid for by Owner, <br />provided that ownership is transferred and assigned to the Owner and the materials and supplies conform <br />to the requirements of the Contract Documents. <br />If the unpaid balance of the Contract Sum exceeds the direct and indirect cost of the completed Work, <br />including construction management services, such excess shall be paid to the Contractor. If such costs <br />exceed such unpaid balance, the Contractor shall pay the difference to the Owner. Such costs incurred by <br />the Owner will be verified by the Owner’s Representative and incorporated into a Change Order, but in <br />finishing the Work, the Owner may negotiate for materials, Equipment and services to complete the Work <br />and will not be required to obtain the lowest figure for Work performed. <br />Where the Contractor services have been so terminated by the Owner, the termination shall not affect any <br />rights of the Owner against the Contractor then existing or which may thereafter accrue. Any retention or <br />payment of monies due the Contractor by the Owner will not release the Contractor from liability. <br />If the Owner terminates this agreement for default, and it is thereafter determined that the Contractor had <br />not so failed to perform its obligations or defaulted in any way, the termination shall then be deemed to <br />have been made for the convenience of the Owner pursuant to 5.4.2 Termination For Convenience. In <br />that event, any adjustment of Contract Sum shall be in accordance with the General Conditions.
The URL can be used to link to this page
Your browser does not support the video tag.