My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Apex Mechanical LLC 2/23/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Apex Mechanical LLC 2/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 3:13:53 PM
Creation date
2/23/2026 2:49:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Apex Mechanical LLC
Approval Date
2/23/2026
Council Approval Date
2/4/2026
Department
Transit
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Station HVAC and Controls Improvements
Tracking Number
0005125
Total Compensation
$1,938,636.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 20 <br /> <br /> <br /> <br />00 72 00 - 20 GENERAL CONDITIONS <br />The Contractor covenants and agrees that in the event suit is instituted by the Owner for any default on <br />the part of the Contractor and the Contractor is adjudged by court of competent jurisdiction to be in <br />default, the Contractor shall pay to the Owner all costs, expenses expended or incurred by the Owner in <br />connection therewith. <br />In exercising the Owner’s right to prosecute the Physical Completion of the Work, the Owner shall have <br />the right to exercise its sole discretion as to the manner, method, and reasonableness of the costs of <br />completing the Work. In the event that the Owner takes Bids for remedial Work or Physical Completion <br />of the project, the Contractor shall not be eligible for the Award of such Contracts. <br />5.4.2. Termination for Convenience <br />Without prejudice to any other remedy it may have under law or and/or the provisions of the Contract, the <br />Owner may terminate this Contract for convenience, with or without cause, in whole or in part, at any <br />time by giving written notice to the Contractor. Termination will be effective upon receipt of such Notice <br />by the Contractor. The Contractor shall immediately discontinue Work and take all reasonable steps with <br />its suppliers and subcontractors to minimize cancellation charges and other costs. <br />In the event of termination for convenience, the Contractor shall be compensated as provided in 9.2.3. <br />Deleted Work. The Contractor will be entitled to no further payments whatsoever for the Work. <br />In the event of a breach or default by the Contractor, Owner may, at its sole option, terminate this <br />Contract in whole or in part for convenience as provided herein. The Owner may pursue any and all <br />contractual, legal and equitable remedies for such breach or default. Absent an express written agreement <br />to the contrary, a termination for the Owner’s convenience shall not be deemed a waiver or release of any <br />rights by the Owner nor shall the Owner be estopped from any legal or equitable remedies that may be <br />appropriate. <br />5.4.3. Termination by Contractor after Suspension <br />If the Work has been wholly suspended pursuant to 5.3. Suspension Procedures for more than ninety <br />(90) days as measured from the date of the notice to suspend, then the Contractor may terminate this <br />Contract by providing Owner with ten (10) days’ Notice that the Contractor shall deem the Contract to be <br />terminated if the Owner does not provide Contractor with notice to resume Work within those ten (10) <br />days. Such termination shall be treated as a termination for the Owner’s convenience pursuant to 5.4.2. <br />Termination for Convenience. <br />5.4.4. Contractor Obligations upon Termination <br />On receipt of notice of termination, the Contractor shall immediately discontinue the Work but shall do <br />such Extra Work as may be ordered by the Owner’s Representative or Owner to safeguard the Work then <br />completed and the materials and Equipment then delivered to the Site of the Work and to leave the Work <br />in a safe and useful condition. Payment for this Extra Work will be made in accordance with 9.2. <br />PAYMENT FOR CHANGES. <br />5.4.5. Ownership of Materials upon Termination <br />As of the termination date, whether effected by the Owner or Contractor as provided herein, all the <br />Contractor's right, title, and interest in and to materials ordered by the Contractor prior to termination, <br />whether or not they have been delivered to the Site of Work, shall be vested in the Owner, and the <br />Contractor shall, upon demand of the Owner, execute and deliver to the Owner all requisite bills of sale, <br />assignments, and other documents of transfer that may be necessary to give effect to the intention of the <br />termination procedures set forth above. <br />5.4.6. Opportunity to Cure <br />If the Contractor has not already had an opportunity to cure the default or breach the Owner shall specify <br />the default or breach and a reasonable period of time to allow the Contractor to cure the default or breach. <br />The notice of termination will state the time period in which cure is permitted and other conditions as the <br />Owner, in its sole judgment, shall deem appropriate. If Contractor fails to remedy the breach or default or
The URL can be used to link to this page
Your browser does not support the video tag.