Apex Mechanical LLC 2/23/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Apex Mechanical LLC 2/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 3:13:53 PM
Creation date
2/23/2026 2:49:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Apex Mechanical LLC
Approval Date
2/23/2026
Council Approval Date
2/4/2026
Department
Transit
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Station HVAC and Controls Improvements
Tracking Number
0005125
Total Compensation
$1,938,636.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 30 <br /> <br /> <br /> <br />00 72 00 - 30 GENERAL CONDITIONS <br />taking possession and use shall not be deemed as acceptance of the Work. Takeover of completed <br />portions of the Work shall be at the Owner's option and will not be made until the Work can be put into <br />routine service on a permanent basis. <br />The guarantee provided in this section 8.9 shall be in addition to those specific guarantee or warranty <br />requirements for particular Equipment and Work items as indicated in the Specifications. <br />8.10. CORRECTION PERIOD <br />If within one year after the date of Substantial Completion, or such longer period of time as may be <br />prescribed by the terms of any applicable special guarantee or warranty required by the Contract <br />Documents) or by any specific provision of the Contract Documents, any Work is found to be defective, <br />or if the repair of any damage to the land or areas made available for Contractor’s use by Owner or <br />permitted by Laws and Regulations as contemplated in Paragraph 8.6.6. is found to be defective, <br />Contractor shall promptly, without cost to Owner and in accordance with Owner’s written instructions: <br />1. repair such damaged land or areas; or <br />2. correct such defective Work; or <br />3. if the defective Work has been rejected by Owner, remove it from the Project and replace it with <br />Work that is not defective, and <br />4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of <br />others or other land or areas resulting there from. <br />If Contractor does not promptly comply with the terms of Owner’s written instructions, or in an <br />emergency where Delay would cause serious risk of loss or damage, Owner may have the defective Work <br />corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and <br />damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other <br />professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such <br />correction or repair or such removal and replacement (including but not limited to all costs of repair or <br />replacement of Work of others) will be paid by Contractor. <br />The Owner is hereby authorized to make such repairs if, ten (10) days after giving of such notice to the <br />Contractor, the Contractor has failed to make or undertake the repairs with due diligence. In case of an <br />emergency where, in the opinion of the Owner, Delay could cause serious loss or damage, repairs may be <br />made prior to or concurrent with notice being sent to the Contractor. All expenses in connection with <br />such repairs will be charged to the Contractor. <br />In special circumstances where a particular item of equipment is placed in continuous service before <br />Substantial Completion of all the Work, the correction period for that item may start to run from an earlier <br />date if so provided in the Specifications. <br />Where defective Work (and damage to other Work resulting there from) has been corrected or removed <br />and replaced under this Paragraph 8.10, the correction period hereunder with respect to such Work will be <br />extended for an additional period of one year after such correction or removal and replacement has been <br />satisfactorily completed. <br />Contractor’s obligations under this Paragraph 8.10 are in addition to any other obligation, guarantee or <br />warranty. The provisions of this Paragraph 8.10 shall not be construed as a substitute for or a waiver of <br />the provisions of any applicable statute of limitation or repose.