My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Apex Mechanical LLC 2/23/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Apex Mechanical LLC 2/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 3:13:53 PM
Creation date
2/23/2026 2:49:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Apex Mechanical LLC
Approval Date
2/23/2026
Council Approval Date
2/4/2026
Department
Transit
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Station HVAC and Controls Improvements
Tracking Number
0005125
Total Compensation
$1,938,636.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 31 <br /> <br /> <br /> <br />00 72 00 - 31 GENERAL CONDITIONS <br />9. MEASUREMENT AND PAYMENT <br />9.1. PAYMENTS TO CONTRACTOR <br />9.1.1. Schedule of Values <br />The Contractor shall submit a Schedule of Values at least fifteen (15) days prior to submitting its first <br />Application for Payment. If the Project contains Unit Price Work, in whole or in part, then the Schedule <br />of Values for that portion of the Work shall also be based on unit prices. If the Bid form calls for a lump <br />sum price, in whole or in part, then the Schedule of Values shall: reasonably allocate the Contract Sum <br />among the various portions of the Work; be complete; be organized to include detailed breakdown of each <br />major unit of the Work; be organized to correspond to Contractor’s schedule; break down the Contract <br />Sum showing the value assigned to each part of the Work; include an allowance for profit and Overhead; <br />include Unit Price Work, if and to the extent indicated on the Bid form; be so organized as to facilitate <br />assessment of work and payment of Subcontractors; and be balanced. To the greatest extent possible, the <br />breakdown shall use the same tasks or units as the Contractor’s schedule. Contractor shall provide <br />documentation substantiating the cost allocation if asked by the Owner’s Representative. Upon <br />acceptance of the Schedule of Values by the Owner’s Representative, it shall be used as a basis for all <br />requests for payment. <br />9.1.2. Progress Payments <br />9.1.2.1 Payment Request Procedures: <br />By the tenth day of each month, or by schedule mutually agreed upon in writing by the Contractor and <br />Owner’s Representative, the Contractor shall submit to the Owner’s Representative a partial payment <br />estimate filled out and signed by the Contractor covering acceptable Work performed during the previous <br />month, or since the last partial payment estimate was submitted. Contractor’s submission of a progress <br />pay estimate constitutes a material representation by the Contractor that it performed all of the Work <br />described in the progress pay estimate during the relevant time period in a workmanlike manner and that <br />the materials for which payment is requested reasonably conform to the Specifications and are either on <br />the job Site or have been installed. If requested by the Owner’s Representative, the Contractor shall <br />provide such additional data as may be reasonably required to support the payment estimate. Such data <br />may include satisfactory evidence of payment for Equipment, materials and labor including payments to <br />Subcontractors and Suppliers. Certified invoices by the Suppliers shall accompany a request for payment <br />for delivered Equipment and material. Such Equipment and material shall be suitably and safely stored at <br />the Site of the Work. Payment requests shall summarize accepted operating and maintenance material <br />with request for Equipment payment. A progress payment is preliminary only. By making a progress <br />payment, the Owner does not waive or release its right, nor is it estopped from asserting, that previous <br />progress payments were not earned or were in error, whether in whole or in part. <br />9.1.2.2 Review Procedures: <br />The Owner’s Representative will review the estimate and either indicate in writing to the Owner his or <br />her concurrence with the estimate and his or her recommendation that payment be made, or indicate in <br />writing to the Contractor his or her reasons for not concurring with the estimate. If the Owner’s <br />Representative recommends payment and the Owner concurs, the Owner will pay the Contractor a <br />progress payment on the basis of the approved partial payment estimate, less retainage and any amounts <br />the Owner may withhold pursuant to Contract or law. The recommendation of the Owner’s <br />Representative is not conclusive, final or binding upon the Owner. <br />In the event the Owner’s Representative does not concur with the estimate, the Contractor may make the <br />changes necessary to obtain the Owner’s Representative's concurrence and resubmit the partial payment <br />estimate, or submit the original progress payment estimate directly to the Owner, indicating in writing its <br />reasons for refusing to make the changes necessary to obtain concurrence.
The URL can be used to link to this page
Your browser does not support the video tag.