My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Apex Mechanical LLC 2/23/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Apex Mechanical LLC 2/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 3:13:53 PM
Creation date
2/23/2026 2:49:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Apex Mechanical LLC
Approval Date
2/23/2026
Council Approval Date
2/4/2026
Department
Transit
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Station HVAC and Controls Improvements
Tracking Number
0005125
Total Compensation
$1,938,636.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 32 <br /> <br /> <br /> <br />00 72 00 - 32 GENERAL CONDITIONS <br />9.1.2.3 Retained Percentage <br />As provided in 9.7. Retainage, the Owner will retain five percent (5%) of all progress payments. <br />9.1.2.4 Withholding <br />The Owner’s Representative may refuse to recommend the whole or any part of any payment if in the <br />Owner’s Representative's opinion it would be incorrect to make such recommendation to the Owner. The <br />Owner’s Representative may also refuse to recommend any such payment, or because of subsequently <br />discovered evidence or the result of tests, may nullify any such payment previously recommended to such <br />extent as may be necessary in the Owner’s Representative's opinion to protect the Owner from loss as a <br />result of: <br />1. Defective or damaged Work. <br />2. A deductive Change Order. <br />3. Persistent failure of the Contractor to perform the Work in accordance with the Contract <br />Documents, including failure to maintain the progress of the Work in accordance with the <br />construction schedule. Persistent failure to maintain the progress of the Work shall mean that for <br />a period of two consecutive months following a written notice from the Owner’s Representative <br />or Owner, the Contractor fails to correct a behind-schedule condition at a rate that would <br />reasonably indicate that he or she will finish the Project on schedule. <br />4. Disregard of authority of the Owner or Owner’s Representative or the laws of any public body <br />having jurisdiction. <br />5. Liquidated damages. <br />6. Misrepresentation of the quality of materials installed or amount of Work performed. <br />7. Discovery that a previous pay estimate erred with respect to the amount of Work performed or <br />materials installed, irrespective of the Owner’s Representative’s recommendation at the time of <br />the progress pay estimate. <br />8. Any other event that consists of a default under Section 5.4.1 of these General Conditions. <br /> <br />The Owner may refuse to make payment of the full amount recommended by the Owner’s Representative <br />because of Contract Claims made against the Owner on account of Contractor's performance or furnishing <br />the Work or because of liens filed in connection with the Work or other set offs entitling Owner to reduce <br />the amount recommended. In such case, the Owner shall give Contractor prompt written notice with copy <br />to the Owner’s Representative stating the reasons for each action. <br />9.1.3. Final Payment <br />Upon receipt of Contractor’s written Notice that the Work is ready for final inspection and acceptance and <br />upon receipt of a final Application for Payment, the Owner’s Representative will inspect the Work. If the <br />Owner’s Representative finds the Work acceptable under the Contract Documents and the Contract fully <br />performed and if the Contractor has signed a final contract voucher certification in the form provided by <br />the Owner, the Owner’s Representative will issue a final certificate for payment. The certificate for <br />payment (or certificate of completion) will state that to the best of the Owner’s Representative's <br />knowledge, the Work appears to have been completed in accordance with the plans and specifications. <br />If the Contractor fails, refuses, or is unable to sign and return the final contract voucher <br />certification or any other documentation required for completion and final acceptance of the <br />Contract, the Owner reserves the right to establish a completion date (for the purpose of meeting <br />the requirements of RCW 60.28) and unilaterally sign the final contract voucher certification and <br />accept the Contract. Unilateral final acceptance will occur only after the Contractor has been <br />provided the opportunity, by written request from the Owner, to voluntarily submit such <br />documents. The date the City Council accepts the Work shall constitute the completion date and
The URL can be used to link to this page
Your browser does not support the video tag.