Laserfiche WebLink
CITY OF EVERETT BID SET <br />EVERETT STATION HVAC AND CONTROLS IMPROVEMENTS <br />PROJECT NO. 24-3201 <br /> <br />01 29 73 -5 SCHEDULE OF VALUES <br />1.08 COST CATEGORIES <br />A. Assign following, making sum equal to total cost for each line item activity to show initial costs of work <br />activity and total installed cost. <br />1. Labor. <br />2. Equipment. <br />3. Material. <br />4. Subcontractor. <br />5. Overhead and Profit. <br />6. Total Cost. <br />B. Show total sum for each cost category as well as total cost for each work activity. <br />PART 2 - PRODUCTS (NOT USED) <br /> <br />PART 3 - EXECUTION (NOT USED) <br />END OF SECTION 01 29 73 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />