My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Apex Mechanical LLC 2/23/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Apex Mechanical LLC 2/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 3:13:53 PM
Creation date
2/23/2026 2:49:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Apex Mechanical LLC
Approval Date
2/23/2026
Council Approval Date
2/4/2026
Department
Transit
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Station HVAC and Controls Improvements
Tracking Number
0005125
Total Compensation
$1,938,636.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT BID SET <br />EVERETT STATION HVAC AND CONTROLS IMPROVEMENTS <br />PROJECT NO. 24-3201 <br /> <br />01 31 19 -1 PROJECT MEETINGS <br /> <br />GENERAL <br />1.01 PRECONSTRUCTION MEETING <br /> After award of the Contract, Engineer will schedule a pre-construction conference at a date and time mutually <br />agreeable to all concerned parties. Engineer will conduct conference, record minutes, and issue copies <br />thereof to all in attendance. <br /> Attendance: Owner, Engineer, Engineer's consultants as requested by Engineer will be in attendance. <br />Require attendance by Contractor's project manager and job superintendent, mechanical Subcontractor, <br />electrical Subcontractor, and other Subcontractors, Suppliers, and parties interested in the performance of <br />the Work as necessary. <br /> Purpose: Purpose of the conference is to introduce all primary parties involved in the construction of the <br />Project and to review procedures to be followed during construction. Discussion will follow detail Project <br />Manual requirements including, but not limited to: <br /> Project Directory: <br /> Project number and title. <br /> Names, telephone numbers, and email address of the following: <br />1) Owner. <br />2) Contractor. <br />3) Engineer and Engineer's design team. <br /> Names of project managers, superintendents, and foremen and accompanying telephone <br />and FAX numbers for the following: <br />1) Contractor. <br />2) Contractor's major Subcontractors. <br />3) Mechanical Subcontractor. <br />4) Electrical Subcontractor. <br /> Communications: <br /> Channel of communications. <br /> Requirements for use of Project identification. <br /> Instructions to Contractor. <br /> Oral conversations and requirements for written backup. <br /> Appropriate Contractor-Owner communication. <br /> Requests for information from Contractor to Engineer or to Owner.
The URL can be used to link to this page
Your browser does not support the video tag.