My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Apex Mechanical LLC 2/23/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Apex Mechanical LLC 2/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 3:13:53 PM
Creation date
2/23/2026 2:49:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Apex Mechanical LLC
Approval Date
2/23/2026
Council Approval Date
2/4/2026
Department
Transit
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Station HVAC and Controls Improvements
Tracking Number
0005125
Total Compensation
$1,938,636.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Everett Station HVAC and Controls Improvements 00 21 13 - 7 <br /> <br /> <br /> <br />00 21 13 - 7 INSTRUCTIONS TO BIDDERS <br />1-02.5 Bid Form <br />The City reserves the right to arrange the bid forms with alternates and additives, if such <br />be to the advantage of the City. The Bidder shall bid on all alternates and additives set <br />forth in the Bid Form unless otherwise specified. <br />1-02.6 Preparation of Bid <br />Bids shall be submitted on the forms provided by the City and found in the Contract <br />Documents. All blank spaces in the Bid form shall be legibly filled in using a non-erasable <br />medium. Do not qualify Bids, since this will automatically be cause for rejection of the Bid. <br />A Bid will be rejected if the authorized Bid form furnished by the City is not used. <br />Bid prices shall include everything necessary for the completion of the Work including, but <br />not limited to, providing the materials, equipment, tools, plant and other facilities, and the <br />management, superintendence, labor, and all necessary testing services. <br />Bidders are warned against making erasures or alterations of any kind to the Bid Form, <br />and bids that contain omissions, erasures, or irregularities of any kind may be rejected. <br />No oral, telegraphic, electronic, or telephonic bids or modifications will be considered. <br />In the event that the product of a unit price and an estimated quantity does not equal the <br />extended amount quoted, the unit price shall govern, and the correct product of the unit <br />price and the estimated quantity shall be deemed to be the amount bid. If the sum of two <br />or more items in a bidding schedule does not equal the total amounts quoted, the individual <br />item amounts shall govern and the correct total shall be deemed to be the amount bid. <br />RCW 35.22.650 CERTIFICATION <br />Contractor agrees that the Contractor shall actively solicit the employment of minority <br />group members. Contractor further agrees that the Contractor shall actively solicit Bids <br />for the subcontracting of goods or services from qualified minority businesses. Contractor <br />shall furnish evidence of the Contractor's compliance with these requirements of minority <br />employment and solicitation. Contractor further agrees to consider the grant of <br />subcontracts to said minority bidders on the basis of substantially equal proposals in the <br />light most favorable to said minority businesses. The Contractor is required to submit <br />evidence of compliance with this section as part of the Bid by completing and submitting <br />with the Bid the RCW 35.22.650 CERTIFICATION. <br />SUBCONTRACTOR IDENTIFICATION FORM <br />If SECTION 00 43 36 –SUBCONTRACTOR IDENTIFICATION FORM is included in the <br />bid package, then Bidder shall complete and submit SECTION 00 43 36 – <br />SUBCONTRACTOR IDENTIFICATION FORM. <br /> <br />NONCOLLUSION AFFIDAVIT <br />The City has determined every Bidder must submit a Non-Collusion Affidavit for every <br />Project. Accordingly, the Bidder shall submit a “Non-Collusion Affidavit”, contained in the <br />Contract Documents as SECTION 00 45 19 NONCOLLUSION AFFIDAVIT, with the Bid. <br />If the City has reason to believe that collusion exists among Bidders, the City will reject <br />the Bids of the known participants in such collusion and may, at its option, require that all <br />Bidders certify under penalty of perjury, that no collusion has occurred or exists. <br />
The URL can be used to link to this page
Your browser does not support the video tag.