My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Apex Mechanical LLC 2/23/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Apex Mechanical LLC 2/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 3:13:53 PM
Creation date
2/23/2026 2:49:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Apex Mechanical LLC
Approval Date
2/23/2026
Council Approval Date
2/4/2026
Department
Transit
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Station HVAC and Controls Improvements
Tracking Number
0005125
Total Compensation
$1,938,636.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Everett Station HVAC and Controls Improvements 00 21 13 - 11 <br /> <br /> <br /> <br />00 21 13 - 11 INSTRUCTIONS TO BIDDERS <br />5. Attendance at a conference with the Engineer or representatives of the <br />Engineer, <br />6. Obtain, and furnish a copy of, a business license to do business in the City of <br />Everett. <br />7. A copy of State of Washington Contractor’s Registration, or <br />8. Any other information or action taken that is deemed necessary to ensure that <br />the Bidder is the lowest responsible bidder. <br />After Bid opening, but prior to award, the apparent successful Bidder shall, if requested <br />by the City, attend a pre-award conference to respond to questions by the City regarding <br />evaluation of Bids. The City will emphasize items such as insurance and bonding that <br />will assist in prompt issuance of the Notice to Proceed. By conducting a pre-award <br />conference, the City has not thereby waived its right to make determinations regarding <br />responsiveness and responsibility of the Bidder. <br /> <br />1-03 AWARD AND EXECUTION OF CONTRACT <br />1-03.1 Consideration of Bids <br />Bids will be evaluated by the City to determine which bid is the lowest responsive bid by <br />a responsible bidder and which bid, if any, should be accepted in the best interest of the <br />City. The right is reserved by the City to waive informalities in the bidding, accept a Bid of <br />the lowest responsible Bidder, reject any or all Bids, republish the call for Bids, revise or <br />cancel the Work, or require the Work to be done in another way if the best interest of the <br />City is served. <br />Within 5 days after the opening of Bids (or such longer time as the City may grant in <br />writing), a Bidder who wishes to claim error shall submit a notarized affidavit signed by the <br />Bidder, accompanied by original work sheets used in the preparation of the Bid, requesting <br />relief from the responsibilities of Award. The affidavit shall describe the specific error(s) <br />and certify that the work sheets are the originals used in the preparation of the Bid. The <br />Engineer will review the certified work sheets to determine the validity of the claimed error <br />and make recommendation to the City. If the City concurs in the claim of error, the Bidder <br />will be relieved of responsibility, and the bid deposit of the Bidder will be returned. <br />Thereafter, at the discretion of the City, all Bids may be rejected or Award made to next <br />lowest and responsive Bidder. <br />1-03.1(2) Preference for Resident Contractors <br />In accordance with RCW 39.04.380, if a Bid is received from a nonresident contractor <br />from a state that provides a percentage bidding preference and does not have an <br />office located in Washington, then a comparable percentage disadvantage will be <br />applied to the Bid of that nonresident contractor. <br />1-03.1(3) Tie Bids <br />After opening Bids, if two or more lowest responsive and responsible Bid totals are <br />exactly equal, then the tie-breaker will be determined by drawing as described in this <br />section. Two or more slips of paper will be marked as follows: one marked “Winner” and <br />the other(s) marked “unsuccessful”. The slips will be folded to make the marking unseen. <br />The slips will be placed inside a box. One authorized representative of each Bidder shall <br />draw a slip from the box. Bidders shall draw in alphabetic order by the name of the firm <br />as registered with the Washington State Department of Licensing. The slips shall be
The URL can be used to link to this page
Your browser does not support the video tag.