My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Apex Mechanical LLC 2/23/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Apex Mechanical LLC 2/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 3:13:53 PM
Creation date
2/23/2026 2:49:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Apex Mechanical LLC
Approval Date
2/23/2026
Council Approval Date
2/4/2026
Department
Transit
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Station HVAC and Controls Improvements
Tracking Number
0005125
Total Compensation
$1,938,636.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Everett Station HVAC and Controls Improvements 00 21 13 - 10 <br /> <br /> <br /> <br />00 21 13 - 10 INSTRUCTIONS TO BIDDERS <br />i. The Bid Form does not constitute a definite and unqualified offer to meet the <br />material terms of the Bid invitation; or <br />j. More than one proposal is submitted for the same project from a Bidder under <br />the same or different names. <br />2. A Proposal may be considered irregular and may be rejected if: <br />a. If the Bid Form includes unit prices, the Bidder’s Bid Form does not include a <br />unit price for every Bid item; <br />b. If the Bid Form includes unit prices, any of the Bidder’s unit prices are <br />excessively unbalanced (either above or below the amount of a reasonable <br />Bid) to the potential detriment of the City, as determined by the City; <br />c. Receipt of Addenda is not acknowledged; <br />d. A member of a joint venture or partnership and the joint venture or partnership <br />submit Proposals for the same project (in such an instance, both Bids may be <br />rejected); or <br />e. If Bid Form entries are not made in ink. <br />1-02.14 Disqualification of Bidders <br />A Bidder will be deemed not responsible if the Bidder does not meet the mandatory <br />bidder responsibility criteria in RCW 39.04.350(1), as amended, and noted in 1-02.1(1). <br />The City will verify that the Bidder meets the mandatory bidder responsibility criteria in <br />RCW 39.04.350(1). To assess bidder responsibility, the City reserves the right to request <br />documentation as needed from the Bidder and third parties concerning the Bidder’s <br />compliance with the mandatory bidder responsibility criteria. <br />If the City determines the Bidder does not meet the mandatory bidder responsibility <br />criteria in RCW 39.04.350(1) and is therefore not a responsible Bidder, the City shall <br />notify the Bidder in writing, with the reasons for its determination. If the Bidder disagrees <br />with this determination, it may appeal the determination within two business days of the <br />City’s determination by presenting its appeal and any additional information to the City. <br />The City will consider the appeal and any additional information before issuing its final <br />determination. If the final determination affirms that the Bidder is not responsible, the <br />City will not execute a contract with any other Bidder until at least two business days <br />after the Bidder determined to be not responsible has received the City’s final <br />determination. <br />A Bidder will be deemed not responsible if the Bidder does not meet supplemental <br />responsibility criteria, all as set forth herein and in SECTION 00 22 13, SUPPLEMENTAL <br />INSTRUCTIONS TO BIDDERS. <br /> <br />1-02.15 Pre-Award Information <br />Before awarding any contract, the City may require one or more of these items or actions <br />of the apparent lowest responsible Bidder: <br />1. A complete statement of the origin, composition, and manufacture of any or <br />all materials to be used, <br />2. Samples of these materials for quality and fitness tests, <br />3. A progress schedule, in a form the City requires, showing the order of and <br />time required for the various phases of the Work, <br />4. A breakdown of costs assigned to any bid item,
The URL can be used to link to this page
Your browser does not support the video tag.