My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Apex Mechanical LLC 2/23/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Apex Mechanical LLC 2/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 3:13:53 PM
Creation date
2/23/2026 2:49:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Apex Mechanical LLC
Approval Date
2/23/2026
Council Approval Date
2/4/2026
Department
Transit
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Station HVAC and Controls Improvements
Tracking Number
0005125
Total Compensation
$1,938,636.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Everett Station HVAC and Controls Improvements 00 21 13 - 13 <br /> <br /> <br /> <br />00 21 13 - 13 INSTRUCTIONS TO BIDDERS <br />Contract Documents. The bonds must be accompanied by a fully executed and original <br />power of attorney for the officer executing on behalf of the surety. <br />1-03.5 Failure to Execute Contract <br />Failure to return the proof of insurance and the bonds with the signed Contract as required <br />in these Instructions, or failure or refusal to sign the Contract, or failure to register as a <br />contractor in the state of Washington shall result in forfeiture of the bid bond or deposit of <br />this Bidder. If this should occur, the City may then Award the Contract to the second lowest <br />responsible Bidder or reject all remaining Bids. If the second lowest responsible Bidder <br />fails to return the required documents as stated above within the time provided after <br />Award, the Contract may then be Awarded successively in a like manner to the remaining <br />lowest responsible Bidders until the above requirements are met or the remaining Bid are <br />rejected. <br />In addition, failure to have or obtain a City of Everett business license prior to executing <br />the Contract, unless immediately cured by Bidder after notice from the City, shall result in <br />forfeiture of the proposal bond or deposit of this Bidder. <br />1-03.6 Return of Bid Deposit <br />When Bids have been examined and corrected as necessary, proposal bonds and <br />deposits accompanying Bids ineligible for further consideration will be returned. All other <br />proposal bonds and deposits will be held until the Contract has been properly executed. <br />When the Contract has been properly executed, all remaining deposits or bonds, except <br />those subject to forfeiture, will be returned. <br />Within 15 calendar days after the Bids are opened, the City will return the bid deposit <br />accompanying the Bids that are not to be considered in making the Award. <br />1-03.7 Judicial Review <br />All protests by Bidders must be in accordance with Chapter 3.46 of the Everett Municipal <br />Code, “Bid Protest Procedures.” <br />The exclusive venue of all lawsuits shall be in Snohomish County Superior Court. <br />OTHER MATTERS <br />Time of Completion <br />The Contractor shall complete the Work on or before the date or dates specified in Section <br />00 52 13 - AGREEMENT FORM <br />Equal Employment Opportunity <br />The Contractor will be required to assure that equal employment opportunities will be in effect <br />to all individuals throughout the duration of this Contract, pursuant to SECTION 00 72 00, <br />Part 7 “Labor Standards,” of the Contract Documents. The Contractor must comply with all <br />local, State and Federal laws pertaining to non-discrimination and equal employment <br />opportunity. <br />Sales Tax <br />The Washington State Department of Revenue has issued special rules on the State sales <br />tax. The Contractor should contact the Washington State Department of Revenue for <br />answers to questions in this area. The City will not adjust its payment if the Contractor bases <br />a Bid on a misunderstood tax liability. The Contractor shall not include State retail sales taxes <br />in the unit bid prices. A separate line item for applying State retail sales tax is provided in the <br />Bid Form.
The URL can be used to link to this page
Your browser does not support the video tag.