My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Apex Mechanical LLC 2/23/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Apex Mechanical LLC 2/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 3:13:53 PM
Creation date
2/23/2026 2:49:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Apex Mechanical LLC
Approval Date
2/23/2026
Council Approval Date
2/4/2026
Department
Transit
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Station HVAC and Controls Improvements
Tracking Number
0005125
Total Compensation
$1,938,636.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Everett Station HVAC and Controls Improvements 00 21 13 - 14 <br /> <br /> <br /> <br />00 21 13 - 14 INSTRUCTIONS TO BIDDERS <br />Limitations Regarding Contractor’s Claim for Damages <br />Bidders should review the Contract Documents regarding limitations on claims for <br />damages. <br />Delays and Interference <br />Bidders should review the Contract Documents regarding delays and interference. <br />Business License <br />A City of Everett business license is required for the Contractor and Subcontractors <br />performing Work on this Project. <br />BIDDER’S CHECKLIST <br />Forms for Submission with the Bid <br />The Bidder’s attention is especially called to the following forms that must be executed in <br />full as required and submitted with the Bid. <br />1. Bid Form: Show the lump sum and unit price items in the spaces provided on the <br />Bid Form. To be filled in and signed by the Bidder <br />2. Subcontractor Identification Form: To be filled in by the Bidder, if included in the <br />bid package. <br />3. Bid Security: This form is to be executed by the Bidder and the surety company <br />unless Bid is accompanied by a certified or cashier’s check, as required by these <br />instructions. The amount of the bond or cashier’s check, which shall be not less <br />than five percent of the Total Bid Amount, may be shown in dollars or on a <br />percentage basis. <br />4. RCW 35.22.650 Certification: To be filled in and signed by the Bidder. <br />5. Non-Collusion Affidavit: To be signed, notarized and submitted with the Bid. <br />Failure to complete and fully execute the aforementioned forms and to submit them with <br />the Bid may result in rejection of Bid. However, as stated in the Subcontractor <br />Identification Form, a portion of that form may be submitted after the Bid. <br />Forms for Submission after Award of Contract <br />The following forms are to be executed after the award of Contract: <br />1. Contract: This Contract to be executed by the successful Bidder with the City’s <br />AdobeSign system within 3 business days after receipt from the City’s AdobeSgn <br />system. <br />2. Payment and Performance Bonds: These forms are to be executed by the <br />successful Bidder and the Bidder’s surety company. The amount of these bonds <br />shall be 100 percent of the Total Bid and shall be submitted within 14 days after <br />the Notice of Award. <br />3. Proof of Insurance: Insurance certificates and endorsements shall be obtained <br />and maintained in force in accordance with SECTION 00 72 00, Part 15 “Liability <br />and Insurance”, of the Contract Documents. These shall be submitted within 14 <br />days after the Notice of Award. <br />4. Power of Attorney: Attorneys-in-fact who sign bid bonds or contract bonds must <br />file with each bond a certified and effectively dated copy of their Power of Attorney. <br />5. Statement of Intent to Pay Prevailing Wage (L&I Form F700-029-000) and Affidavit <br />of Wages Paid (F700-007-000) from the Contractor, Subcontractor and agents to <br />the Subcontractor shall be submitted to the Employment Standards Division, State
The URL can be used to link to this page
Your browser does not support the video tag.