IMCO General Construction, Inc. 2/17/2026 Change Order 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 2/17/2026 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:20:09 AM
Creation date
2/24/2026 10:18:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
2/17/2026
Council Approval Date
5/4/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Phase 2 Capital Upgrades
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$1,222,203.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PROJECT: City of Everett <br />WFP Phase 2 Capital Upgrades WO No. 3763 <br /> <br />WORK CHANGE DIRECTIVE – No. 14 <br />DATE OF ISSUANCE: January 28, 2026 <br /> <br />You are directed to proceed promptly with the following change (s): <br /> <br />Description: Procure and deliver spare parts for the progressive cavity polymer pumps as <br />described on the attached invoice. <br /> <br />Purpose of WCD-14: WCD-14 is intended to account for additional construction costs related <br />to procurement and delivery of spare parts for the progressive cavity polymer pumps. <br />Payment for the items will be made on a time and material cost accounting basis. The <br />estimated cost of procurement and delivery shown below and on the attached supporting <br />documents represent a not to exceed amount. A future contract change order will be executed <br />to formally account for actual cost of procuring and delivering the items including GC fees, <br />indirect costs, etc. <br /> <br />If a claim is made that the above change(s) have affected Contract Price or Contract Times, any <br />claim for a Change Order based thereon will involve one or more of the following methods of <br />determining the effect of the change(s). <br /> <br />Method of determining change Method of determining change <br />In Contract Price: in Contract Times: <br /> <br /> Lump Sum Contractor’s records <br /> <br /> Time and Material Engineer’s records <br /> <br /> Other - Other – N/A <br /> <br /> <br />Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: <br />$4,798.32 Substantial Completion 0 days: <br />If the change involves an increase, the Ready for final payment 0 days: <br />estimated amount is not to be exceeded If the change involves an increase, the <br />estimated without further authorization. times are not to be exceeded without further authorization. <br /> <br /> <br />ACCEPTED: IMCO General Construction AUTHORIZED: City of Everett <br /> <br />By: Date: By: Date: (Authorized Signature) (Authorized Signature) <br />Page 1 of 1 <br />1/28/26