My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 2/17/2026 Change Order 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 2/17/2026 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:20:09 AM
Creation date
2/24/2026 10:18:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
2/17/2026
Council Approval Date
5/4/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Phase 2 Capital Upgrades
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$1,222,203.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
WFP Phase 2 Capital Improvement Project - IMCO General Construction - Progressive Cavity Pump Spare Parts <br />NA <br />HOURS RATE HOURS RATE <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />LS 1.0 4798.32 <br />0.00 <br />4798.32 <br />4798.32 <br />IN USE AMOUNT <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />AMOUNT <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Work witnessed but entitlement to be paid as extra work has not been determined <br />The contractor certifies that the contents listed on this sheet are a complete and accurate listing of the Force Account work performed today. <br />The owners representative verifies that this is a fair and reasonable listing of the labor, material and equipment quantities used but it is not an <br />authorization for payment until all backup for costs are submitted, verified and approved by the Resident Engineer <br />Progressive Cavity Pump Spare Parts as requestedDescription of Work: <br />CONTRACTOR PERFORMING <br />WORK: <br />REPORTED BY: <br />IMCO <br />Mitchell Sorestad <br />AMOUNT <br />STRAIGHT TIME OVERTIME <br />RENTAL RATEBLUE BOOK RATE <br />RENTEDHOURSCONTR. OWNED <br />9.44% MARKUP FOR FIXED GC's <br />SUBTOTAL LABOR $ <br />NAME <br />DAILY FORCE ACCOUNT FIELD DOCUMENTATION <br />FORCE ACCOUNT BID ITEM OR CO #: <br />DATE WORK PERFORMED: <br />REPORT #: <br />CONTRACTOR TRACKING #: <br />DATE: <br />PROJECT NAME or WP#:WFP Phase 2 Capital Improvement Project <br />Monday, January 5, 2026 <br />TRADE/CLASSIFICATION AMOUNT <br />Owner Rep to Mark if Applicable: <br />GC SIGNATURE FOR SUBS (optional) <br />LABOR <br />SUBMITTED BY - CONTRACTOR/ SIGN & DATE REQUIRED - OWNER REP./ SIGNATURE & DATE <br />TOTAL EQUIPMENT $ <br />IMCO / Mitchell Sorestad City of Everett / Zach Brown <br />TOTAL LABOR $ <br />UNIT QTY PRICE <br />4798.32 <br />DESCRIPTION (Include Size, Type, Manufacturer, Etc..)VENDOR <br />MATERIALS <br />Progressive Cavity Pump Spare Parts Harrington <br />TOTAL MATERIALS $ <br />NAME DESCRIPTION <br />9.44% MARKUP FOR FIXED GC's (none included at this time since this isnt a budget re-allocation or change order at this time) <br />SUBTOTAL MATERIALS $ <br />9.44% MARKUP FOR FIXED GC's <br />SUBTOTAL EQUIPMENT $ <br />DESCRIPTIONYEAR/MAKE/MODEL/EQ# <br />EQUIPMENT <br />Subcontractor <br />TOTAL EQUIPMENT RENTAL TAX $ <br />4798.32TOTAL $ <br />TOTAL SUBCONTRACTOR $ <br />9.44% MARKUP FOR FIXED GC's <br />SUBTOTAL EQUIPMENT $ <br />QTYUNIT UNIT PRICE <br />SUBMITTED BY - CONTRACTOR/ PRINT NAME REQUIRED - OWNER REP./ PRINT NAME
The URL can be used to link to this page
Your browser does not support the video tag.