My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 2/17/2026 Change Order 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 2/17/2026 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:20:09 AM
Creation date
2/24/2026 10:18:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
2/17/2026
Council Approval Date
5/4/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Phase 2 Capital Upgrades
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$1,222,203.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />PUBLIC WORKS <br /> 3200 Cedar Street <br />Everett, WA 98201 <br /> 425.257.8800 <br />425.257.8882 fax <br /> everettpw@everettwa.gov <br />everettwa.gov/pw <br />Contract Budget Reallocation Agreement <br /> <br /> <br />Project: Water Filter Plant Phase 2 Capital Upgrades <br />Everett Project Number: UP 3763 <br />Phase 2 Services Budget Reallocation: 2 <br />Effective Date: 11/7/25 <br /> <br />The following formalizes Phase 2 Services Budget Reallocation 2 to the <br />construction contract between IMCO General Construction, Inc. (IMCO) and the <br />City of Everett (City) for the Water Filter Plant Phase 2 Capital Upgrades Project <br />(Project). <br /> <br />Contract Sum <br />Phase 2 Services Budget Reallocation 2 does not revise the contract sum for the <br />Project. The Guaranteed Maximum Price (GMP) for Phase 2 Services (Project <br />construction) remains $25,707,420.86 exclusive of Washington state sales tax. <br /> <br />Contract Time <br />Phase 2 Services Budget Reallocation 2 does not revise the contract time for the <br />Project. The required date of Substantial Completion of Phase 2 Services <br />remains April 30, 2026. <br /> <br />Description of Changed Work <br /> <br />Phase 2 Services Budget Reallocation 2 modifies four (4) bid items and adds two <br />(2) new items to the contract as follows. A fund reallocation summary detailing <br />source and destination of reallocated funds is also provided. <br /> <br />Modified Item: <br />Bid Item 140.00 Flocculation Basin Improvements – Modify existing bid item <br />140.00 by adding $844,440.51 in funds resulting in a revised total bid item value <br />of $8,173,585.77. <br /> <br />Bid Item 300.00 Contingency – Modify existing bid item 300.00 by deducting <br />$908,575.00 in funds resulting in a revised bid item value of $0.00. <br /> <br />Bid Item 310.00 Allowance – Modify existing bid item 310.00 by deducting <br />$56,109.65 in funds resulting in a revised total bid item value of $353,834.62. <br />This revised total bid item value remains allocated as Owner’s Allowance. <br /> <br />Bid Item 340.00 General Conditions Fee – Modify existing bid item 340.00 by <br />adding $10,371.94 in funds resulting in a revised total bid item value of <br />$1,789,815.57. <br /> <br />New Items: <br />New Item 430.00 5-Line Thrust Block – Create new item 430.00 entitled 5_Line <br />Thrust Block by adding a new lump sum line item in the amount of $38,063.52.
The URL can be used to link to this page
Your browser does not support the video tag.