My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 2/17/2026 Change Order 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 2/17/2026 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:20:09 AM
Creation date
2/24/2026 10:18:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
2/17/2026
Council Approval Date
5/4/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Phase 2 Capital Upgrades
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$1,222,203.21
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 6363 - 4 <br />Water Filter Plant – Phase 2 Capital Upgrades WO #3763 <br />Page 4 of 4 <br /> <br />Change Order No. 1 <br />Change Order Effective Date: 2/4/26 <br /> <br />Exhibit A—Description of Changed Work <br /> <br />Change Order No. 1 modifies four (4) items and adds two (2) new items as follows. A Change <br />Order 1 fund calculation and allocation summary and backup documentation for Work Change <br />Directives (WCD) 13 and 14 is also provided. <br /> <br />Modified Items: <br />Item 320 Phase 2 DB Fee – Modify existing item 320 by adding $63,372.39 in funds resulting in <br />a revised total item value of $1,679,566.10. <br /> <br />Item 340 General Conditions Fee – Modify existing item 340 by adding $208,290.00 in funds <br />resulting in a revised total item value of $1,998,105.57. <br /> <br />Item 350 Pass Thru Cost – Modify existing item 350 by adding $53,131.99 in funds resulting in a <br />revised total item value of $1,302,714.78. <br /> <br />Item 440 Field Directed Change Orders – Modify existing item 440 by adding $4,798.32 in funds <br />resulting in a revised total item value of $76,607.00. <br /> <br />New Items: <br />Item 450 Flocculation Basin Crack Repairs – Create new item 450 entitled Flocculation Basin <br />Crack Repairs by adding a new lump sum item in the amount of $433,521.87. <br /> <br />Item 460 IMCO 40% Contingency Share – Create new item 460 entitled IMCO 40% <br />Contingency Share by adding a new lump sum item in the amount of $363,340.00. <br /> <br />Justification: <br />Change Order No.1 adjusts the construction contract to incorporate additional work efforts and <br />costs associated with WCD 13 and WCD 14 and to reinstate the contractor’s (IMCO) 40% share <br />of project contingency funds that were previously used to pay for additional costs associated <br />with WCDs 3-12. WCDs 3-12 and the temporary reallocation of the contingency funds being <br />reinstated is described in detail in Budget Reallocation 2 (attached). <br /> <br />WCD 13 Justification – WCD-13 accounts for additional construction costs related to flocculation <br />basin coating repairs due to coating system failures in all four trains of the flocculation basin. <br />Repairs in train 4 include coating removal and replacement as necessary to repair coating <br />defects due to dynamic and static cracking. Repairs in trains 1-3 include coating removal and <br />replacement as necessary to repair coating defects due to static cracking. Repairs shall be <br />made as recommended in the attached crack repair letter from Tnemec to Long Painting dated <br />August 14, 2025. WCD-13 and supporting documentation is attached. <br /> <br />WCD 14 Justification – WCD-14 accounts for additional construction costs related to <br />procurement and delivery of spare parts for the progressive cavity polymer pumps. WCD-14 and <br />supporting documentation is attached. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.