WFP Phase 2 - Change Order 1 Summary <br />2/4/2026 <br />Allowance and Contingency Funds Remaining After Budget Reallocation 2 <br />300 Contingency -$ <br />310 Allowance 353,834.62$ <br />Added Cost Summary <br />WCD 13 Estimated Costs <br />Direct Cost of Work 787,356.49$ <br />Phase 2 DB Fee (8%)62,988.52$ <br />Subtotal Including Fee 850,345.01$ <br />GC Fee (5 mos, Extended Overheads)207,837.04$ <br />Pass Through Cost 52,845.61$ <br />WCD 13 Total Cost w/o Tax 1,111,027.66$ <br />WCD 14 Estimate Costs <br />Direct Cost of Work 4,798.32$ <br />Phase 2 DB Fee (8%)383.87$ <br />GC Fee (9.44%)452.96$ <br />Subtotal Including Fees 5,635.15$ <br />Subtotals <br />P&P Bond ($5635.15 @ 1.2%)67.62$ 5,702.77$ <br />Retainage Bond ($5702.77 @ 0.5%)28.51$ 5,731.28$ <br />B&O Tax ($5731.28 @ 0.65%)37.25$ 5,768.54$ <br />Builders Risk ($5768.54 @ 0.6%)34.61$ 5,803.15$ <br />Liability Ins. ($5803.15 @ 2.04%)118.38$ <br />Subtotal Pass Through Costs 286.38$ <br />WCD 14 Total Cost w/o Tax 5,921.53$ <br />Change Order 1 Summary w/o Tax <br />WCD 13 & WCD 14 Total Cost 1,116,949.19$ <br />310 Allowance 353,834.62$ <br />Subtotal WCD 13 & WCD 14 Funds to <br />be Added 763,114.57$ Note: WCD 13 and WCD 14 total cost minus 310 Allowance funds. <br />Reinstated IMCO Contingency Share 363,340.00$ <br />Change Order 1 IMCO Contract Total 1,126,454.57$ <br />Allocation of Funds Summary <br />320 Phase 2 DB Fee 63,372.39$ Modify existing item. WCD 13 and WCD 14 DB fee. <br />340 GC Fee 208,290.00$ Modify existing item. WCD 13 and WCD 14 GC Fee <br />350 Pass Through Cost 53,131.99$ Modify existing item. WCD 13 and WCD 14 pass through costs. <br />440 Field Directed Change Orders 4,798.32$ Modify existing item. WCD 14 direct cost of work. <br />New Item 450 Flocc Basin Crack <br />Repairs 433,521.87$ New contract item. WCD 13 direct cost of work minus 310 Allowance funds. <br />New Item 460 IMCO 40% Share of <br />Contingency 363,340.00$ New contract item. Reinstatement of IMCO's 40% share of original contract contingency. <br />Change Order 1 Summary w/ Tax <br />Change Order 1 IMCO Contract Total 1,126,454.57$ Cross check, matches Change Order 1 IMCO contract total. <br />Sales Tax (8.5%)95,748.64$ <br />Change Order 1 Total 1,222,203.21$ <br />Original Contract Change Order 1 Contract After <br />Change Order 1 <br />Amount 25,707,420.86$ 1,126,454.57$ 26,833,875.43$ <br />WSST 2,185,130.77$ 95,748.64$ 2,280,879.41$ <br />Total 27,892,551.63$ 1,222,203.21$ 29,114,754.84$ <br />Note: Total contingency prior to Budget Reallocation 2 was $908,575.00. IMCO's 40% share of <br />contingency ($363,340) was borrowed during the reallocation and is to be reinstated in full via <br />Change Order 1. <br />Note: Owner's allowance will be used to pay for additional costs incurred due to WCD 13 and <br />WCD 14. Total amount of Change Order 1 will be be the cost of WCD 13 and WCD 14 plus fees <br />and pass through costs minus allowance funds.