Granite Construction Co. 2/26/2026 Change Order 8
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Co. 2/26/2026 Change Order 8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 9:50:19 AM
Creation date
2/26/2026 9:50:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Co.
Approval Date
2/26/2026
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Dan Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Amendment/Change Order
Change Order
Amendment/Change Order Number
8
Tracking Number
0004373
Total Compensation
$134,711.87
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction 6/13/2024
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A <br />Change Order No. 08 <br />Change Order Effective Date: 02/11/2026 <br /> <br /> <br />Pier 1 Lagging Angle Iron Coating – New Item 226 <br />The Contractor is directed to coat one-half of the L8x8x1 angle irons shown on Plan sheets S51 and <br />S29 with one coat of inorganic rich primer. These are the angles installed for lagging purposes. <br />Compensation for this change will be a lump sum of $662.27. <br />Justification <br />Plan sheets S29 and S51 did not specify any corrosion protection for the angles which are provided <br />to facilitate placement of lagging between the back wall and soldier pile. <br />Contract Time: There is no added contract time due to this change. <br /> <br />Added New Rock Wall at Pier 4 – New Item 227 <br />The Contractor is directed to install a new two-tiered terraced gravity rock wall approximately 70’ <br />long with height of 30” for each wall on the property line of 3814 Mukilteo Blvd as directed by the <br />Engineer in the field. The Contractor shall also install: <br />• A new Catch Basin at the toe of the new rock wall and connect drainage lines to it as <br />directed by the Engineer in the field. <br />• Relocate the newly installed 12” HDPE pipe to avoid interference with Pier 1 wingwall. <br />• Extend the HMA limits to the toe of the new rock wall. <br />Compensation for procurement of materials and installation shall be by force account. It is expected <br />to be in an amount of approximately $75,000. <br />Justification <br />Installation of a new wall is necessary to retain the front yard of the property owner and avoid an <br />unprotected sharp drop off which is a safety concern. Other added changes are also necessary to <br />accommodate installation of this new wall. <br />Contract Time: There is no change to the Contract time due to this addition <br />