Contractor's Name
Apex Mechanical LLC
Approval Date
3/2/2026
Council Approval Date
2/4/2026
Department
Transit
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Station HVAC and Controls Improvements
Tracking Number
0005125
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 52 13 - 2 <br /> <br /> <br /> <br />00 52 13 - 2 <br />every calendar day (or working day, if Contract Time is described in working days) in the <br />amounts set forth in this Section. For failure to achieve Substantial Completion by the <br />Substantial Completion date stated above, the Contractor shall pay liquidated damages to the <br />City computed at the daily rate of fifteen percent (15%) of the Contract Sum divided by the <br />number of days of Contract Time stated above. Once Substantial Completion is achieved, for <br />failure to achieve Physical Completion by the Physical Completion Date stated above, the <br />Contractor shall pay liquidated damages at the daily rate of ten percent (10%) of the liquidated <br />damages rate applicable to delays to Substantial Completion. <br />4. Contract Sum. The Contract Sum of this Contract is: <br />Base Bid $1,764,000.00 <br />+ WA Sales Tax $ 174,636.00 <br />Contract Sum $ 1,938,636.00 <br />This is based on the proposal/bid submitted by Contractor dated 12/23/25. A copy of such <br />proposal/bid is attached hereto. <br />The basis for final payment will be the actual amount of work performed according to the <br />Contract Documents and payments, whether partial or final, shall be made as specified therein. <br />If, and to the extent, payment (in whole or in part) is based upon unit prices multiplied by <br />quantities of work actually performed, the total amount paid to the Contractor may be less <br />than Contract Sum stated herein and the Contractor agrees to execute one or more change <br />orders in such event. In no event shall the total amount paid Contractor exceed the Contract <br />Sum stated herein, unless the Contract amount has first been increased by one or more Change <br />Orders signed by the City. The City may, in its sole discretion, withhold amounts from <br />payments otherwise due as offsets or back charges for expenses, damages, liquidated damages <br />or costs for which the Contractor is liable for not to exceed 10% of the total amount of the <br />contract. If the City chooses not to offset or deduct any such expenses, damages, liquidated <br />damages or costs from one or more payments or return of retainage, the City does not waive its <br />claim for such damages and hereby expressly reserves its right to assert a claim against the <br />Contractor for such damages. <br />5. Withholding. Five percent (5%) of amounts due Contractor shall be retained and withheld <br />to comply with RCW Chap. 60.28. Retained amounts shall only be released: (A) as required by <br />law or (B) sixty (60) days after completion of all contract work if there are no claims against the <br />retained funds. In addition to the amounts required by RCW 60.28 to be withheld from the <br />progress or retained percentage payments to the Contractor, the City may, in its sole discretion, <br />withhold any amounts sufficient to pay any claim against the Contractor of which the City may <br />have knowledge and regardless of the informalities of notice of such claim arising out of the <br />performance of this Contract. The City may withhold the amount until either the Contractor