My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Apex Mechanical LLC 3/2/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Apex Mechanical LLC 3/2/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2026 1:49:32 PM
Creation date
3/3/2026 1:48:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Apex Mechanical LLC
Approval Date
3/2/2026
Council Approval Date
2/4/2026
Department
Transit
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Station HVAC and Controls Improvements
Tracking Number
0005125
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />City of Everett Eve rett St atio n HVAC and Co ntrols Improvements <br />SECTION 00 45 13 -BIDDER QUALIFICATION STATEMENT <br />PROJECT NAME: Ev e rett Station HVAC and Controls Improvements <br />CONTRACTOR'S <br />COMPANY NAME: <br />00 45 13 - 1 <br />---------------------- <br />DATE: _________________________ _ <br />ADDRESS: ____________ _ <br />TELEPHONE: ------------- <br />The Bidder must document that the Bidder meets the Supplemental Responsibility <br />Criteria in the Supplementary Instructions to Bidders (Section 00 2 2 13). The Bidder <br />should provide additional sheets to fully describe referenced projects and experience . <br />1. The Supplementary Instructions to Bidders (Section 00 22 13) states that the <br />Bidder must have successfully completed at least three (~ Similar Projects within <br />the five (5) years prior to bid open ing. List the Similar Projects that show that <br />Bidder has this experience: <br />PROJECT NAME OWNER LOCATION <br />00 45 13 - 1 BIDDER QUALIFICATION STATEMENT <br />Apex Mechanical LLC <br />12/23/2025 <br />1507 SE Eaton Blvd Battle Ground, WA 98604 <br />360-666-8735 <br />McKnight Middle School Piping Replacement and Chiller Upgrade <br />2025 Renton School District No. 403 Administrative Offices 300 SW 7th Street Renton, WA 98057 Renton School District Capital Planning and Construction Office 7812 S 124th Street Seattle, WA 98178 Project Manager: Ladd Stejskal ladislav.stejskal@rentonschools.us (425) 204-4407 <br />1200 Edmonds Ave NE,Renton, WA 98056 <br />Replace existing chilled water and heating water piping with new piping. Perform associated ceiling removal and reinstallation work. <br /> Replace existing chiller with new scroll chiller. Replace existing chilled water pumps and associated variable frequency drives. <br />Replace existing chiller plant appurtenances, including, but not limited to air separator, expansion tank and chemical filter feeder. <br />Provide new chilled water buffer tank. Provide new mechanical DDC controls, low voltage, switchgear, for chilled water plant. <br />Total contract Price: $1,182,000.00
The URL can be used to link to this page
Your browser does not support the video tag.