Laserfiche WebLink
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />City of Everett Eve rett St atio n HVAC and Co ntrols Improvements <br />SECTION 00 45 13 -BIDDER QUALIFICATION STATEMENT <br />PROJECT NAME: Ev e rett Station HVAC and Controls Improvements <br />CONTRACTOR'S <br />COMPANY NAME: <br />00 45 13 - 1 <br />---------------------- <br />DATE: _________________________ _ <br />ADDRESS: ____________ _ <br />TELEPHONE: ------------- <br />The Bidder must document that the Bidder meets the Supplemental Responsibility <br />Criteria in the Supplementary Instructions to Bidders (Section 00 2 2 13). The Bidder <br />should provide additional sheets to fully describe referenced projects and experience . <br />1. The Supplementary Instructions to Bidders (Section 00 22 13) states that the <br />Bidder must have successfully completed at least three (~ Similar Projects within <br />the five (5) years prior to bid open ing. List the Similar Projects that show that <br />Bidder has this experience: <br />PROJECT NAME OWNER LOCATION <br />00 45 13 - 1 BIDDER QUALIFICATION STATEMENT <br />Apex Mechanical LLC <br />12/23/2025 <br />1507 SE Eaton Blvd Battle Ground, WA 98604 <br />360-666-8735 <br />MI-22 LENT Mechanical Improvements Project <br />2025 <br />Portland Public Schools 501 N Dixon St. Portland, OR 97227Owner Contact: Robert Jole 626-841-0258 rjole@pps.net <br />5105 SE 97th Ave Portland, OR <br />The project required all new electrical wiring and a new power source and switchgear. Coordination with the local power provider was required to upgrade the powerlines bringing power to the school. New concrete forms to protect the electrical equipment were constructed by Apex Mechanical and placed in the ground near the entrance of the school. This required heavy civil work to <br />construct proper drainage for the new concrete containers. Coordination with the city for closures of SE Steel St. for the removal and repaving of approximately 30 feet of the two-lane road to allow for the installation of new water lines.Sidewalks on both sides of the street were also reconstructed. The school entrance drive was reconnected to the street incorporating all safety requirements for walkways and signage. Large sections of the schools parking lot and entrance were removed and repaved under this contract.All new fire sprinkler systems were installed throughout the school. Structural enhancements were made to the roofing above the gym to support the new rooftop HVAC equipment. All new electrical wiring was supplied <br />to support the new equipment. Roofing and gutters were replaced. This project required asbestos abatement and DCC controls integration with the existing BAS as well as installation of a back up generator <br />Total contract Price: $9,318,936.00