My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Apex Mechanical LLC 3/2/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Apex Mechanical LLC 3/2/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2026 1:49:32 PM
Creation date
3/3/2026 1:48:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Apex Mechanical LLC
Approval Date
3/2/2026
Council Approval Date
2/4/2026
Department
Transit
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Station HVAC and Controls Improvements
Tracking Number
0005125
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />City of Everett Eve rett St atio n HVAC and Co ntrols Improvement s 00 45 13 - 3 <br />3. The Supplementary Instructions to Bidders (Section 00 22 13) states that the <br />Bidder's superintendent for the Project must have successfully supervised the <br />completion of at least three (3) Similar Projects within the five (5) years prior to bid <br />opening. List the superintendent's name and projects that show that he or she has <br />this experience: <br />Name: -------------------- <br />PROJECT NAME YEAR OWNER LOCATION -- <br />Furnish references for information concerning all work listed above: <br />NAME TITLE PHONE NUMBER EMAIL ADDRESS <br />4. The Supplementary Instructions to Bidders (Section 00 22 13) states that the <br />Bidder's principal foreman for the Project must have successfully supervised the <br />00 45 13 - 3 BIDDER QUALIFICATION STATEMENT <br />MI-22 LENT Mechanical Improvements Project 2025 Portland Public Schools 5105 SE 97th Ave. Portland, OR 97266 <br />Replace existing steam boiler with a VRF System in occupied area. Total Contract Price: $9,318,936.00 <br />Britt Rosenlund <br />ODVA Salem HVAC Replacement, Salem, OR 2025 <br />Sate of Oregon - Oregon Department of Veteran Affairs 700 Summer St. NE, Salem, OR 97301 <br />Alteration of ODVA office building and approx. 78,000 sq ft 4 story building. HVAC system update and replacement. 1. Installation of VRF heat recovery heat pump systems with dedicated outside air systems with air distribution systems. Total Contract Price: $1,317,718.00 <br />Longview SD HVAC 2024 Longview School District No.122 <br />RA Long HS: 2903 Nichols Blvd, Discovery HS: 2742 Harding St., Longview, WA 98632 <br />PRIME Contract for HVAC and indoor air quality improvements and associated work at R.A. Long Highl Schooland Discovery High School.Total Contract Price: $1,384,197.00 <br /> Andy Twyman, Project Manager, (360) 921-8294, andrew.twyman@esd112.org <br />Kelly Mann (971) 349-2117 kelly.mann@das.oregon.goProject Manager <br />Robert Jole 626-841-0258 rjole@pps.netProject Manager
The URL can be used to link to this page
Your browser does not support the video tag.