Laserfiche WebLink
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />City of Everett Eve rett St atio n HVAC and Co ntrols Improvement s 00 45 13 - 4 <br />completion of at least three (3) Similar Projects within the five (5) years prior to bid <br />opening. List the principal foreman 's name and projects that show that he or she <br />has this experience: <br />Name: -------------------- <br />PROJECT NAME YEAR OWNER LOCATION <br />Furnish references for information concerning all work listed above: <br />NAME PHONE NUMBER EMAIL ADDRESS <br />5. Name and title of person filling out form: <br />NAME TITLE <br />END OF SECTION 00 45 13 <br />00 45 13 - 4 BIDDER QUALIFICATION STATEMENT <br />John Muonio Member <br />Dylan Breckenridge <br />Santiam Canyon ES Mechanical Upgrade Project 2023 Santiam Canyon School District 450 SW Evergreen St., Mill City, OR 97360 <br />HVAC and Electrical Service upgrade for the existing Elementary Schoolbuilding.A new chiller to be mounted at grade and replacement airhandlers added to the mechanical spaces. Electrical upgrades support new mechanical equipment and controls. Total Contract Price: $1,368,631.00 <br />York ES HVAC Upgrades 2022-175 2023 Evergreen School District No.114 9301 NE 152nd Ave, Vancouver, WA 98682 <br />provide all labor, equipment, materials, project management, and site supervision as required to complete the York Elementary School HVAC Upgrades scope of work described in the project drawings and specifications. Total Contract Price: $869,800.00 <br />Cascade MS HVAC 2022-177 2022 Evergreen School District No.114 13900 NE 18th St., Vancouver, WA 98684 <br />HVAC upgrade. This includes a complete mechanical upgrade of the boiler room with associated piping and pumps. In tandem with this, we are giving the school a complete DDC upgrade with new wiring as well as control valves and associated control components and logic. Total Contract Price: $1,008,352.00 <br />Ali Abbazedagen Project Manager 480-570-2443 ali@randcmanagement.com <br />Ali Abbazedagen Project Manager 480-570-2443 ali@randcmanagement.com <br />Todd Miller Superintendent 503-897-2321 todd.miller@santiam.k12.or.us