My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Washington State Department of Ecology 3/3/2026 Amendment 2
>
Contracts
>
Agreement
>
Grant Agreement (City as Grantee)
>
Washington State Department of Ecology 3/3/2026 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2026 1:54:03 PM
Creation date
3/3/2026 1:53:51 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Washington State Department of Ecology
Approval Date
3/3/2026
Council Approval Date
2/25/2026
End Date
1/31/2027
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
Water Quality Combined Financial Assistance
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0003492
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Grant Agreement (City as Grantee)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 6 of 10State of Washington Department of Ecology <br />CITY OF EVERETT <br />Water Quality Retrofit/Improvements; City of Everett’s Programmatic Effort Project <br />Agreement No. WQC-2022-EverPW-00030 <br />Amendment No. 2 <br />Task Goal Statement: <br />Construction of the project in accordance with ECOLOGY-accepted plans and specifications. <br />Task Expected Outcome: <br />Constructed project will provide water quality benefits including reductions in total suspended solids (TSS) and oil <br />(total petroleum hydrocarbons). <br />Deliverables <br />Due DateDescriptionNumber <br />5.1 Signed and dated construction contract. Upload to EAGL and notify <br />ECOLOGY when upload is complete. <br />5.2 Stormwater Construction Completion Form. Upload to EAGL and <br />notify ECOLOGY when upload is complete . <br />CHANGES TO SCOPE OF WORK <br />Task Number:6 Task Cost: $1,300.00 <br />Task Title:Project Close Out <br />Task Description: <br />The RECIPIENT shall ensure the following items are completed and provide the associated deliverables to <br />ECOLOGY. The RECIPIENT must approve all materials prior to submitting them to ECOLOGY for acceptance . <br />A. The RECIPIENT will operate and maintain the constructed facility for the design life of the facility . The <br />RECIPIENT will develop and submit an Operations and Maintenance (O&M) plan for all facilities constructed with <br />ECOLOGY funding to ECOLOGY for review. The O&M plan must address long-term activities to assure ongoing <br />pollutant removal and flow-control capability of the project in accordance with the design manual. O&M plan <br />development guidance is located in the Design Deliverables Document available on the ECOLOGY website . Allow 15 <br />calendar days for ECOLOGY review. <br />B. The RECIPIENT will calculate and submit a final equivalent new/re-development area for the completed retrofit <br />project(s) using the methods outlined in the Design Deliverables Document. <br />C. The RECIPIENT will submit the final GIS compatible project area in shapefile , geodatabase file, or <br />ECOLOGY-approved equivalent. The project area should include polygon features for stormwater facilities and <br />contributing areas. <br />D. The RECIPIENT will submit the Recipient Closeout Report (RCOR) in EAGL in accordance with Task 1. <br />Template Version 10/30/2015 <br />Docusign Envelope ID: 058AEFEE-1732-470C-984D-33881F8EEDBD
The URL can be used to link to this page
Your browser does not support the video tag.