My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Washington State Department of Ecology 3/3/2026 Amendment 2
>
Contracts
>
Agreement
>
Grant Agreement (City as Grantee)
>
Washington State Department of Ecology 3/3/2026 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2026 1:54:03 PM
Creation date
3/3/2026 1:53:51 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Washington State Department of Ecology
Approval Date
3/3/2026
Council Approval Date
2/25/2026
End Date
1/31/2027
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
Water Quality Combined Financial Assistance
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0003492
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Grant Agreement (City as Grantee)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 5 of 10State of Washington Department of Ecology <br />CITY OF EVERETT <br />Water Quality Retrofit/Improvements; City of Everett’s Programmatic Effort Project <br />Agreement No. WQC-2022-EverPW-00030 <br />Amendment No. 2 <br />provide ECOLOGY with all requested project documentation . <br />Task Expected Outcome: <br />The project will be constructed on schedule and in accordance with accepted plans. <br />Deliverables <br />Due DateDescriptionNumber <br />4.1 Construction Quality Assurance Plan. Upload to EAGL and notify <br />ECOLOGY when upload is complete. Upload ECOLOGY <br />acceptance documentation. <br />4.2 Pre-Construction Conference Meeting Minutes. Upload to EAGL <br />and notify ECOLOGY when upload is complete. <br />4.3 Project Schedule. Submit prior to construction and when changes <br />occur. Upload to EAGL and notify ECOLOGY when upload is <br />complete. <br />4.4 Change Order(s). Upload to EAGL and notify ECOLOGY when <br />upload is complete. Upload ECOLOGY acceptance documentation . <br />CHANGES TO SCOPE OF WORK <br />Task Number:5 Task Cost: $407,620.00 <br />Task Title:Construction <br />Task Description: <br />The RECIPIENT shall ensure the following items are completed and provide the associated deliverables to <br />ECOLOGY. The RECIPIENT must approve all materials prior to submitting them to ECOLOGY for acceptance . <br />A. The RECIPIENT will complete construction of the project in accordance with ECOLOGY -accepted plans and <br />specifications. The construction project will include installation of two TAPE GULD pretreatment devices , a <br />bioretention facility, and retrofit of two existing detention facilities across four sites to mitigate runoff from <br />approximately 24 acres of pollution-generating impervious surfaces. <br />B. Stormwater Construction Completion Form signed by a professional engineer indicating that the project was <br />completed in accordance with the plans and specifications, and major change orders approved by ECOLOGY’s Project <br />Engineer and shown on the Record Drawings. The Stormwater Construction Completion Form can be found on the <br />ECOLOGY website. <br />Template Version 10/30/2015 <br />Docusign Envelope ID: 058AEFEE-1732-470C-984D-33881F8EEDBD
The URL can be used to link to this page
Your browser does not support the video tag.