My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reid Middleton, Inc 3/12/2026 Amendment 2
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Reid Middleton, Inc 3/12/2026 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 4:35:26 PM
Creation date
3/12/2026 4:35:05 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reid Middleton, Inc
Approval Date
3/12/2026
Council Approval Date
3/11/2026
End Date
6/12/2026
Department
Parks & Community Services
Department Project Manager
Lolly Huggins
Subject / Project Title
Thornton A. Sullivan Park Floating Dock Repairs
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0003924
Total Compensation
$4,978.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
August 15, 2025 <br />File No. 242024.005 <br />Ms. Lolly Huggins <br />City of Everett Parks & Facilities <br />802 E Mukilteo Blvd <br />Everett, WA 98203 <br />Reference: (1)Professional Services Agreement dated 05/21/2024 <br />Project Title: Thornton A. Sullivan Park Dock Repairs <br />Subject: Amendment No. 2: Additional Construction Administration <br />Dear Ms. Huggins: <br />We are pleased to submit the following proposal for additional construction administration services, <br />and attendance at the pre-bid walkthrough meeting at Thornton A. Sullivan Park for the Dock Repair <br />Project. This letter serves as a supplement to our referenced agreement. The terms and conditions <br />established by the agreement are unchanged except as noted below. <br />A.SCOPE OF SERVICES <br />Reid Middleton will provide the following services: <br />1.Attendance of one engineer at the pre-bid walkthrough meeting for the Thornton A. <br />Sullivan Park Dock Repair Project. <br />2.Construction Phase Services <br />a.Answer questions prior to the preconstruction meeting. <br />b.Respond to Requests for Information <br />c.Perform two site observations during construction. <br />d.Review technical submittals including material and shop drawing submittals. <br />e.Perform a punchlist walkthrough of the site. <br />f.Attend telephone coordination calls as requested. <br />3.Drawing Revisions; Reid Middleton will visit the site prior to the bid advertisement to <br />update the design drawings to reflect the current condition of the floating docks. <br />4.Assumptions: <br />a.There are no deliverables or meeting follow-up required.
The URL can be used to link to this page
Your browser does not support the video tag.