My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5118 23RD AVE W 2025 Plans 2026-03-16
>
Address Records
>
23RD AVE W
>
5118
>
Plans
>
5118 23RD AVE W 2025 Plans 2026-03-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2026 10:42:04 AM
Creation date
3/16/2026 10:41:55 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD AVE W
Street Number
5118
Permit
B2510-031
Year
2025
Notes
Deck on backyard, 8x9 with 9 steps
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 CITY OF EVERETT PERMIT SERVICES <br /> EVERETT PERMIT APPROVAL & NOTES COVER SHEET <br /> WASHINGTON <br /> STANDARD CONDITIONS OF APPROVAL: REVIEWER APPROVALS: PERMIT <br /> INFORMATION: <br /> 1. Approved plans must be on job site at all times and available for inspectors. PLANNING: Site Address: <br /> vffr,I City of Everett Permit Services 5118 23RD AVE W <br /> 2. See false of permit for permit conditions of approval and additional requirements. REVIEWED FOR CODE COMPLIANCE <br /> By Review Discipline:Planning <br /> Rev er:YTran <br /> Date:10/21/2025 <br /> 3. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at Review Status:Approved for Permit <br /> Owner: <br /> onlinepermits.everettwa.gov to formally request all required inspections. This approval only applies to <br /> the work being performed under Chris Dickson <br /> Permit# B2510-031 <br /> 4. This permit must be finaled in order to close out this permit, legitimize work and grant a Certificate of Occupancy. and does not recognize any <br /> existing structure that may not <br /> meet Zoning Code. <br /> App. Date: <br /> 5. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 10/13/2025 <br /> 811. BUILDING: <br /> 6. All work shall be performed in accordance with the approved permit conditions and plans approved by the City of lylTcityof Everett Permit Services Permit Type: <br /> Everett. <br /> REVIEWED FOR CODE COMPLIANCE TEED UMENT HAVE NOT RESIDENTIAL BUILDING <br /> BEEN APPROVED FOR THE <br /> By Review Discipline:Building ISSUANCE OF PUBLIC WORKS, <br /> Reviewer:C.Bearman MECHANICAL,FIRE SUPPRESSION, <br /> Date7. Protect all existingunderground utilities during construction. Review <br /> Status:A ELECTRICARMITS.L OR PLUMBING <br /> g g Review Status:Approved for Permit PERMITS. <br /> Subtype: <br /> 8. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as OTHER (DECK, PORCH, <br /> directed by the City PW Inspector. <br /> ETC) <br /> 9. Keep City streets clean at all times. No dirt, mud, rocks,or debris to be tracked onto roadway. <br /> 10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious PUBLIC WORKS: Description: <br /> surfaces will be managed on-site in a manner that does not adversely affect neighboring properties, including the Deck on backyard, 8X9 <br /> City's right-of-way and/or easements and the improvements located therein. with 9 Steps <br /> City of Everett Permit Services No changes to site,storm,traffic,sewer,or water <br /> EVERETT Reviewed for Permit 11/18/2025 proposed.No PW Scope <br /> PERMIT NUMBER: <br /> B2510-031 <br />
The URL can be used to link to this page
Your browser does not support the video tag.