My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5118 23RD AVE W 2025 Plans 2026-03-16
>
Address Records
>
23RD AVE W
>
5118
>
Plans
>
5118 23RD AVE W 2025 Plans 2026-03-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2026 10:42:04 AM
Creation date
3/16/2026 10:41:55 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD AVE W
Street Number
5118
Permit
B2510-031
Year
2025
Notes
Deck on backyard, 8x9 with 9 steps
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT 5UMMARY <br /> I ' <br /> ALUMINUM-FRAMED 9'X8' BACK DECK WITH NINE STEPS, a <br /> COMPOSITE DECK BOARDS AND FASCIA-MOUNTED <br /> II ALUMINUM RAILINGS. <br /> 2 <br /> U <br /> z <br /> O o <br /> (n N <br /> I Y 00 <br /> U 0) <br /> o a <br /> PROJECT INFORMATION <br /> z a) <br /> Q w <br /> Lu <br /> OWNER: <br /> GEERDHARRY DHAN15HA DICK50N CHRISTOPHE Q Q <br /> H <br /> PROJECT ADDRESS: = U to <br /> L <br /> 5118 23RD AVE W, EVERETT, WA S8203 Z w O n N <br /> � w � r- <br /> O (D aLn <br /> 0 <br /> C <br /> v v <br /> E <br /> Lm C <br /> a� <br /> GENERAL NOTE5 c a <br /> N M <br /> N N N <br /> • CODE COMPLIANCE <br /> a° a a° <br /> ALL WORK SHALL COMPLY WITH THE INTERNATIONAL RESIDENTIAL CODE (IRC), INTERNATIONAL BUILDING CODE • DECK ATTACHMENT � SUPPORT <br /> (I5G), WASHINGTON STATE BUILDING CODE (WSBC), AND ALL APPLIGABLE LOCAL REGULATIONS. ALL STRUCTURAL CONNECTIONS SHALL 5E INSTALLED PER APPLICABLE CODES AND MANUFACTURER <br /> WHERE CONFLICTS ARISE BETWEEN CODES, THE MOST STRINGENT REQUIREMENT SHALL APPLY. GUIDELINES. <br /> THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL WORK MEETS OR EXCEEDS THE MINIMUM LEGAL THE GONTRAGTOR IS RESPONSIBLE FOR ENSURING PROPER ANCHORING OF STRUGTURAL COMPONENTS USING <br /> REQUIREMENTS. APPROVED FASTENERS AND 5RACKETS. <br /> IF GONDITIONS ARISE THAT REQUIRE MODIFIGATIONS, THE GONTRAGTOR MUST OBTAIN WRITTEN APPROVAL <br /> • SITE INSPECTION � VERIFIGATION 5EFORE MAKING CHANGES. <br /> THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS, AND SITE CONDITIONS PRIOR TO CONSTRUCTION. <br /> ANY DISCREPANCIES, UNFORESEEN CONDITIONS, OR CONFLICTS BETWEEN PLANS AND ACTUAL SITE CONDITIONS • CONTRACTOR DISCRETION � JUSTIFICATION <br /> MUST 5E REPORTED 5EFORE PROCEEDING. THE GONTRAGTOR MAY MAKE FIELD ADJUSTMENTS AND MODIFIGATIONS, PROVIDED THEY: 0 >M <br /> THE CONTRACTOR IS RESPONSIBLE FOR REVIEWING AND UNDERSTANDING ALL PROJECT DOCUMENTS AND SITE GOMPLY WITH ALL APPLIGABLE CODES, REGULATIONS, AND INDUSTRY STANDARDS. V <br /> CONDITIONS. DO NOT COMPROMISE STRUGTURAL INTEGRITY OR PROJECT INTENT. Z .0 U <br /> ARE JU5TIFIA5LE BASED ON SITE CONDITIONS OR PRACTICAL CONSIDERATIONS. _�e .. <br /> • WORKMANSHIP � STANDARDS IF REQUESTED, THE CONTRACTOR MUST PROVIDE JUSTIFICATION FOR ANY DEVIATIONS FROM THE DRAWINGS. U <br /> ALL WORK SHALL 5E PERFORMED IN A WORKMANLIKE MANNER, CONSISTENT WITH INDUSTRY STANDARDS AND ANY MAJOR DEVIATIONS OR MODIFIGATIONS MUST 5E DOCUMENTED AND REPORTED TO THE OWNER OR LV 'a (D <br /> 5EST PRAGTIGES. ARCHITECT. V U <br /> THE CONTRACTOR SHALL ENSURE THAT ALL MATERIALS USED MEET OR EXCEED APPLICABLE CODES AND > 0 MANUFACTURER RECOMMENDATIONS. • INSPEC Q W <br /> TION � APPROVAL � �Q <br /> ANY PROPOSED SUBSTITUTIONS OR DEVIATIONS MUST 5E APPROVED IN WRITING 5EFORE IMPLEMENTATION. THE CONTRACTOR SHALL SCHEDULE AND PASS ALL REQUIRED INSPECTIONS 5EFORE COVERING ANY WORK OR W <br /> PROCEEDING TO THE NEXT PHASE OF CONSTRUCTION. <br /> • STRUGTURAL REQUIREMENTS THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH INSPECTORS TO ENSURE COMPLIANCE WITH ALL J <br /> ALL STRUGTURAL COMPONENTS SHALL 5E INSTALLED IN ACCORDANCE WITH PRESCRIPTIVE SPAN TA5LE5 OR APPLIGABLE CODES. 0 <br /> AN APPROVED ENGINEERED DESIGN. ANY MODIFIGATIONS REQUIRED 5Y INSPECTORS SHALL 5E COMPLETED IN AGGORDANGE WITH THEIR DIREGTION 'a <br /> FOOTINGS SHALL 5E SIZED AND INSTALLED PER LOCAL DEPTH AND LOAD REQUIREMENTS. AT THE GONTRACTOR'S EXPENSE. <br /> DECK FRAMING SHALL 5E CONSTRUCTED USING APPROVED MATERIALS SUITA5LE FOR OUTDOOR USE, SUCH AS <br /> PRESSURE-TREATED WOOD OR CERTIFIED STEEL (OR OTHER) FRAMING SYSTEMS. • SITE GLEANUP � SAFETY <br /> ALL FASTENERS, CONNECTORS, AND HARDWARE SHALL 5E GORROSION-RESISTANT AND GOMPATI5LE WITH THE THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING A GLEAN AND SAFE J05 SITE AT ALL TIMES. <br /> MATERIALS USED. ALL WASTE MATERIALS SHALL 5E DISPOSED OF IN COMPLIANCE WITH LOCAL REGULATIONS. <br /> THE GONTRAGTOR SHALL IMPLEMENT NECESSARY SAFETY MEASURES TO PROTECT WORKERS, PROPERTY, AND designed by IP DESIGN <br /> THE PU5LIG DURING CONSTRUCTION. ilia@ipdesign.group <br /> City of Everett Permit Services <br /> EVERETT Reviewed for Permit 11/14/2025 Page 1/3 <br /> Arch C <br />
The URL can be used to link to this page
Your browser does not support the video tag.