Laserfiche WebLink
All information below is based on the Code Compliance Research Report CCRR-0523 <br /> (Intertek,2024),which verifies compliance of this system with the 2021 IRC and IBC. Connection TABg2ents Ern°"DESIGN CAPAEmE6 <br /> Com neMs Ca Comments <br /> TABLES—FIELD JOIST TFFI AND END JOIST TFRJ'ALLOWABLE SPANS— PSF LIVE LOAD aimloislmwood Ledger s/1s2x ood"ledgert°x zzo it ls,,. Mml be speci9<gromry of—col TABLE 22—STAIR DESIGN LIMITATIONS <br /> ( ) ( ) 2x wood Ledger L531b.with snow load hall,0.42. <br /> loist5 pacing Joists pacing <br /> loist5 Spacing TABLE 6-JO IST SPAN LI MITS FOR LEDG ERLOK FASTENI NG TO WOOD LEDG ER Total Allowable Lead(psO 4w lb(no—rd) Does not meet minimum mrsional Item Components Design Limits i. <br /> P 8 P 8 P e Joist HangerlTFRIHB] resistanceof5"in-Ib;shortL- <br /> 12'0"Joist Span one Side of Beam End Joet to Rim Joist 405Is(Upward) <br /> DL/LL(p5f) SL(p5F) (L/360 Deflection Limit) (L/240 Deflection Limit) (L/180 Deflection Limit) Desi Design Fastenin Pattern Izl V4-zaxl.2s^stews bracket required for added Rim/End Joist Maximum Joist Span:IOU" <br /> B $ Beam Span(fl) sos m-lb lrorsionl mrsional resinance. atsmin a Rim foist(TFRI joist shall be secured with Rim Jois[Han e <br /> 12" 16" 12" 16" 12" 16" D LL SL 8"Hi h Low Pairs 8"on-Center Design 7' g• 9' i0 ii• i2• >3' i4• i5' 8 r ) Hanger <br /> L/ / ) $/ foist Hanger(TFFIHB) SiDownwaMl reslstsmirimumtorsional Attachment and Short L-Bracket ons <br /> With Joist Han er stren h 408 299 229 181 147 121 102 87 75 65 Field Joist to Rim Joist (xl l/4-20x1.xs"stews "0'is up-m) Meetsm <br /> 0 12'30" I3'9" 14'8" 11'4" IS'1" 11'4" 10/100/0 6'0" 12'0" 360 III 299 229 168 122 92 71 56 45 - U 1In z UP2B 1136 in-1b Torsion a ofs441n-Ib Use End Joist(TF)for each stringer <br /> 40' 12,10" I3'4" 14'8" 11'4" 151 11'4" 10/100/40 1 6'11" 1 13'10" U240 1 408 1 299 1 229 1 181 1 147 1 121 1 102 1 83 1 67 1 54 Short L-Bracket Cn9ma56) 450 lb lDownwardl Two screws eacnnange of bracket. Strine 'lEnds ".Is Two strineersl <br /> 10 100 100 12'10" 11'4" 14'8" 11'4" 15 1" 11'4" L/380 408 299 229 181 147 121 102 87 75 65 M 1/4-2ox 1.25"stews 450Is(Upward) Maximums Alon Stair:1 <br /> 0'6" <br /> / 10/100/1D0 6'11" 13'10" Field Joist to Rim Joist Long L-Bracket(TF90ABT8) 6511b IDownwdMl pan g <br /> 150 10'4" 7'9" 10'4" 7'9" 10'4" 7'9" 101100/150 4'9" 9.6" End Joist w Rim Joist (411/4-ZOx 1.25"sews 65110 jU ward) T'4'o screws eachflange of bracket 6tair5tringeY Rim Joist(TFRI) Maximum Rise Without Support:6'0" <br /> Adjust Bracket lTF135ABB) t32 Is(Downward) With Middle Stair Stiinier(Three suing l <br /> 200 7'11" 5'Sl" 7'11" 1.I'll 7'll" 511 101100/200 3'7" 7'3' (41114-zDx125^stews 4321b(u—m) Two screws each flange of bracket. Maximum Span Along Stair:W6" <br /> 0 12'9" 9'7" 12'9" 9'7" 12'1" 9'7" TABLE I7-POST(TFPOSTSOB)ALLONfABLE POSTHEIGHTS-IOU PSF LL/SL Ill 1b(Upward) One screw from beam clip to Joist Maximum Rise Without Su ort:7'0' <br /> 40 12'9" 9'7" 12'9" 9'7" 12'9" 9'7" seam S acin Beam Cllp(TFPBIB) Secure Beam Full Bracket p <br /> Joist to Beam 313 lb(Parallell Two scr-Dom beam clip <br /> ID pzf OL/too peam Spa(110 psf Total Load) I311/4-20z1.2s"stews 1921b Per entllcular be.. <br /> Stair Tread—Front <br /> 30/100 100 12'9" 9'7" 12'9" 9'7" 12'9" 9'7" TABLE 7-FIELD JOIST(TFFJ)AND END JOIST(TFRI)'ALLOWABLE CANTILEVER SPANS Sp g to Post stair Tread Maximum tread width:ae" <br /> ISO 9'3" 6'31" 9''3" 6'31" 9'3" 6'll" Beam Span 6' OF 1. tY 14' to, 18, 20' with two is crews. Stair Tread-Back <br /> Deflection Limit L/360 Deflection Limit L/240 Deflection Limit L/180 secure seam Full Bracket to seam <br /> 200 7'3" S'S" 7 3" 5'S" 7'3" S'S' -M 20 wo 20 20 20 20 20 20 <br /> Joist Spacing Joist Spacing Joist Spacing 8' 20 20 20 20 20 20 19 18 with two screws. Secure Mount Postmoun[ <br /> DL LL (1)Beam Full Bracket(TFPBB) Stair Mounted Deck boards installed on stairtread <br /> a1lb(Parall l) secure seam Chip to seam with one 3-1/2"z3-1/2"z he,137'head <br /> db bolts, <br /> is cker plate <br /> / (psf) 12" 16" 12" 16" 12" 16" 10 20 20 20 20 19 18 17 16 Beam to Post Ill Beam[Ilp(TFPBJB) Guard/Roll Post 36"maximum post height. <br /> TABLE 20—DECK LATERAL LOAD CAPACRIES 546Iblparane0 screw. (d)3/8-16x3-5/8"hezhpdbolts,nuts and washers <br /> 10/4D 3191, 3'S" 4'�" 3'11" 4'D" 4'O,i 12' 20 20 20 19 18 17 I$ 15 (Single Beam) I31 Post Cap(TFPCBI 2691b IPerpentlicular) Secure Beam Clip to Post Cap with Rim Joist TFRI <br /> Deck Board Fastener Fastener Schedule Lateral Load Resistance is 14' 20 20 19 38 16 15 14 12 I711/4-20.1.25"xrews Iwo screws. ( ) <br /> 30/40 3'9" 3'5" 4'0" 3'11" 4'0" 4'0" (4)Halfadjustable Brackets <br /> 7imberTech Advanced PVC f110-12x 1-56"Cortex Driller Two at each 1031bft I6' 20 20 IS 17 IS 14 12 11 For beam splices shadngasingle Suspended Rim Joist Maximum Span Along Stair:10'6" <br /> / / (4)4" <br /> Rim <br /> it.Tabs <br /> per bracket <br /> 10/300 2'9" 2'6" 3'2" 2'10" 3111, 3'2" 18' io 19 17 ss 14 12 11 9 port,Imiall a Beam Clip to each for Drop step stair Maximum tread width:48" <br /> P P 1 / 30/100 2'9" 2'6" 3'2" 2'10" 3'6" 3'2" (DBea,to ouble aeaomt) 1211g�uq Past <br /> x 1P7(5"PCE) ) 528 51b a rpeneicullar) h Bea am wllh two slaewskO m TABILE 23—DES as roll over blocking Tim erTec Hi en Dec (a)a"Rim Joist Ta <br /> Beam Full Brackets <br /> Pa, <br /> ralle <br /> Zure <br /> eac <br /> TimberTech Advanced PVC (TFLOC100) One clip at joist 451bR 20' 20 18 16 15 12 11 9 7 secure each Beam Full Bracket m !aeboIt per tab <br /> [K MOUNTED GUARD DESIGN LIMITATIONS <br /> Secure post to Post Base with at, <br /> Post Base ITFPCB) counts—kscraws. Item Components Design Limitations <br /> Post Use 3/4"Diameter Anchor Bolt 1,1091b(U;P ard) 314^anchor bolt shall be designed <br /> o6 V4-xo.l 1x .,ews 4W Ib(Shear) by omens.capacity shall meet peck Mounted Rail Post L-Bracket Deck boards Installed on joists. <br /> protect load requirements. Guard/Rail Post secure Mount Post Base 42"maximum post height. <br /> Meets IRC 507.9.21,500 It <br /> EXISTINCs HOUSE EXISTING HOUSE wteral wad Tieback Slmpson8/DTT22 1,8 It, minimum. <br /> (B11/4-zso l.2s"xrews Connection to strutture shall be <br /> designed b ethers. Uj <br /> 8'-0' 2 8'-0' a <br /> LEDGER 50ARD POST PER PLAN O <br /> I..L <br /> 31eee PSI CONCRETE <br /> ZE_ 2X8 ALUMINIUM POST BASE FINISHED GRADE <br /> ,� r JOISTS A 12' O.G. O O <br /> r lU� <br /> '01 '� 16"XI6"XI8"FTG TYP =; 4 _ co4 EW.,TSB <br /> t ad — <br /> LU� <br /> d a U <br /> 3XII BEAM TYP 6X6 ALUMINIUM POST TYP f- I I 4 <br /> U. <br /> Z . 4 4 — <br /> 3 WIDE ALUMINIUM STAIRS ON 2 — <br /> ,� STRINGERS <br /> 4-11 <br /> 4'_4'J I I I I I I I I I I- '(n <br /> TIMBERTECH IRX CONCRETE FTG PER PLAN <br /> FASCIA MOUNT RAIG ANCHOR BOLT G (n W <br /> J L #4012" O.G., E.W.,CENTERED Q <br /> MIN y"X6' = W <br /> F. TYPICAL DECK POST TO CONCRETE FOOTING <br /> 0 <br /> aQ <br /> N12"),12"),18"FTG Q <br /> 3'-4' 3_eat 3-4" 3-0 FOR LANDING <br /> tt4 EW.,TSB L <br /> za r) N <br /> SHEATHING W a r- <br /> DECK FLOOR PLAN SIDING O (D a LrA <br /> SCALE Y4' -I" <br /> DECK FRAMING PLAN FLASHING FOR <br /> SCALE: Y4"-l' <br /> WATER TIGHTNESS <br /> DECK BOARD <br /> z <br /> GRK 5/16-IN X 4-IN LAG O <br /> z JOIST HANGER 41 <br /> FLOOR J05 E i.l. <br /> SIMPSON DTTIZ TENSION TIE L r <br /> TYP OF 4, EQ SPCG 0 }1 <br /> can <br /> it N M <br /> N N N <br /> ATTACHMENT TO THE HOUSE a a a <br /> 36'MINIMUM HIGH GUARD <br /> WITH INTERMEDIATE RAILS <br /> SPACED SO THAT A SPHERE 4' <br /> IN DIAMETER CANNOT PASS <br /> THROUGH <br /> DECK <br /> I <br /> fV <br /> In <br /> I <br /> RIM JOIST <br /> DECK JOIST <br /> n O <br /> T7 >M <br /> I rr <br /> FASCIA 00 <br /> L J L J L J L J 1 1 JOIST-TO-BEAM cuP z <br /> L__J ULU (D <br /> Q z <br /> BEAM PER PLAN 0 <br /> V <br /> EAST ELEVATION NORTH ELEVATION U W <br /> SCALE 4'-I' SCALE Ya'-I' Q J Q <br /> POST-TO-BEAM FULL BRACKET W <br /> J <br /> POST PER PLAN <br /> NOTE: <br /> RAILINGS ARE NOT SHOWN FOR CLARITY. THEY WILL <br /> BE INSTALLED ALONG THE ENTIRE PERIMETER OF DROPPED BEAM <br /> THE DECK IN ACCORDANCE WITH PROJECT <br /> REQUIREMENTS AND BUILDING CODES. NOTES: <br /> THE ENTIRE FRAME FOR THIS PROJECT IS CONSTRUCTED USING THE TIMBERTECH ALUMINUM FRAMING SYSTEM.TIMBERTECH ALUMINUM FRAMING IS AN EXTRUDED <br /> ALUMINUM FRAMING SYSTEM USED FOR THE STRUCTURAL FRAMING OF EXTERIOR DECKS.IT 19 AN ASSEMBLAGE OF 6063-T6 ALUMINUM COMPONENTS INSTALLED <br /> WITH METAL BRACKETS,HANGERS,AND FASTENERS.THE SYSTEM 19 CERTIFIED FOR CODE COMPLIANCE UNDER CODE COMPLIANCE RESEARCH REPORT <br /> CCRR-0523 AND IS INTENDED FOR USE AS THE STRUCTURAL FRAMING FOR EXTERIOR DECK APPLICATIONS designed by I PD E S I G N <br /> FASTENERS FOR PRESERVATIVE-TREATED AND FIRE-RETARDANT-TREATED WOOD SHALL BE OF HOT-DIPPED ZINC-COATED GALVANIZED STEEL,STAINLESS IIICI@I deSl n. rou <br /> STEEL,SILICON BRONZE OR COATING WEIGHTS FOR ANC-COATED FASTENERS SHALL BE IN ACCORDANCE WITH ASTM AI53.R311.3 P g g p <br /> City of Everett Permit Services WHERE THE ADJACENT SURFACE OR GRADE IS 30 INCHES OR MORE BELOW THE GUARD,THE GUARDRAIL MUST BE AT LEAST 36 INCHES IN HEIGHT.IT MUST BE <br /> EVE R E T T Reviewed for Permit 11/14/2025 CAPABLE RESISTING(E.G.,A CONCENTRATED LOAD OF 20 POUNDS IN ANY DIRECTION AT THE TOP. ��ge /� <br /> THE INFILL ELEMENTS( . BALUSTERS)MUST RESIST A HORIZONTAL LOAD OF 50 POUNDS APPLIED OVER AONE-SQUARE-FOOT AREA AND MUST BE SPACED <br /> WASHINGTON SUCH THAT A 4-INCH SPHERE CANNOT PA95 THROUGH.R301.EdIll <br /> Arch C <br />