My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GeoEngineers 3/23/2026 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
GeoEngineers 3/23/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2026 3:36:45 PM
Creation date
3/23/2026 3:36:30 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
GeoEngineers
Approval Date
3/23/2026
Council Approval Date
3/11/2026
End Date
12/31/2026
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Year 8 Qualitative Monitoring for Diking Improvement District No. 5 Advance Mitigation Site
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004655
Total Compensation
$25,600.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
GeoEngineers 1/9/2025
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett | February 10, 2026 Page 3 <br />File No. 0661-128-04 <br />■Site visits will be timed based on tidal cycles for site access, and growing season for invasive species <br />identification. <br />■Methods of invasive species management and control will be determined by Cascade Ecology. <br />■We assume agency decisions will be documented in a letter from the agencies and additional <br />documentation prepared by us will not be required. <br />Deliverables <br />■Draft Year 8 invasive species workplan <br />■Final Year 8 invasive species workplan <br />■Invasive and noxious weed geospatial data <br />OPTIONAL TASK 500 – UNIDENTIFIED ADDITIONAL SERVICES <br />GeoEngineers has included an optional task to provide services related to the DID5 Smith Island Estuary <br />Advance Mitigation Site. A fee estimate of $5,000 was used as a placeholder, to authorize this task, an <br />updated description of work for this task must be approved in writing by the City Project Manager. <br />FEE ESTIMATE AND TERMS <br />We plan to conduct field work in the early part of the growing season during accessible tidal cycles to give <br />Cascade Ecology ample time to coordinate and perform invasive species control work. We will keep you <br />apprised of project status and conditions that may significantly affect our scope and fee estimate. Our <br />services will be completed in accordance with the terms described in the existing Professional Services <br />Agreement between GeoEngineers, Inc. and the City of Everett dated January 9, 2025. <br />The total estimated fee for our services described below is $25,600. Actual fee will be determined on a <br />time-and expense basis. The estimated fee for our services will be determined using the rates contained in <br />our standard 2026 Schedule of Charges, which also is attached as part of this proposal. Please see Fee <br />Estimate for an additional breakdown of our fees, which is also attached as part of this proposal. <br />TABLE 1. SUMMARY OF FEES <br />DESCRIPTION FEE <br />Year 8 Qualitative Site Monitoring <br />Task 100 – Project Management and Coordination $2,500 <br />Task 200 – Invasive Species Site Walkthrough $10,000 <br />Task 300 – Invasives Species Work Plan $4,900 <br />Task 400 – Agency Coordination for Performance Standard Revision $3,200 <br />Estimated Task Subtotal $20,600 <br />Optional Task 500 –Unidentified Additional Services <br />Contingency task to cover unanticipated services $5,000 <br />Estimated Task Subtotal $5,000 <br />Estimated Grand Total $25,600
The URL can be used to link to this page
Your browser does not support the video tag.